Instructions for the installer
C
Filling
pipe
3.14 - CONDENSATE DRAIN
During the combustion process the boiler produces
condensate which, through the “A” pipe, flows into the siphon.
The condensate which forms inside the boiler has to be routed
into an adequate drain by means of the pipe “B”.
DANGER!
Before commissioning the appliance fill the
siphon and check the correct drainage of the
condensate.
If the appliance is used with the condensate
drain siphon empty there could be danger of
intoxication resulting from the escape of flue
gasses.
NOTICE
The condensate must be drained from the boiler
in accordance with local, state or federal rules
and regulations.
The connection between the appliance and the sewage sy-
stem must be carried out in compliance with the specific refe-
rence standards, and in particular:
- prevent the end user utilizing the condensate produced;
- a siphon must be fitted (supplied with the boiler);
- there must be no bottlenecks;
- the connection must be made just under the bottom part of
the boiler;
- it must be installed so as to avoid freezing of the liquid
when the boiler is operating and prevent the eventual pres-
surization of the sewage system;
- consent the correct downflow of the appliance’s liquid di-
scharges;
- it must be made with materials which are resistant to con-
densate
-
if the condensate outlet of the boiler is lower than the drain,
a condensate pump must be used.
-
The condensate produced by the boiler has a pH value
between 3 and 4.
-
Install a neutralization unit if required by the local code.
WARNING
Before putting the boiler into operation fill the condensate
trap with 1.27 cups / 300 ml of water. If the boiler will be instal-
led in a high temperature installation such as baseboard with
a supply temperature of 160°F or above, fill the condensate
trap with vegetable oil instead of water.
A
B
Boiler
condensate
inlet
Condensate
outlet,
pipe to
connect to the
sewage
systwm
NOTICE
Use materials approved by the authority having
jurisdiction. in the absence of such authority, PVC
and CPVC pipe must comply with ASTM D1785,
F441 or D2665. Cement and primer must com-
ply with ASTM D2564 or F493.
For Canada, use ULC certified PVC or CPVC
pipe, fittings and cement.
NOTE
Periodic cleaning of the conden-
sate disposal system must be
carried out.
Содержание Alkon 90
Страница 34: ...34 Instructions for the installer ...
Страница 49: ...49 Spare parts ...
Страница 50: ......
Страница 51: ......