Power Manager II
Hercules Development Kit
This document provides a brief introduction and instructions to install and run the Power Manager II
Hercules Standard and Advanced Development Kits on Windows 7/Vista/XP. More documentation
can be downloaded from www.latticesemi.com/herculesdevkit.
Check Kit Contents
The Power Manager II Hercules Development Kit
contains the following items:
• Power Manager II Hercules Evaluation Board
pre-loaded with Hercules support demos
• USB connector cable
• 12V DC wall adapter power supply
• QuickSTART Guide
Static electricity can shorten the lifespan of electronic
components. Please handle the kit components
carefully.
Powering the Evaluation Board
Running the pre-loaded demonstration does not require connecting the provided USB cable to a
PC. The USB cable is required to modify the pre-loaded demo, interface to advanced demos, or
load pre-configured designs. Do not plug the USB cable into the PC until after loading Lattice’s
USB drivers (included with ispVM). The default operating system drivers are not compatible with
Lattice programming tools.
This procedure is continued on the next page.
Main 12V DC Supply
Main Supply Toggle Switch
1.2V DC-DC Supply
Supply Status
LEDs
PLD Output
LEDs
3-Digit
LCD
Panel
Demo DIP
Switch
Slide
Pot.
VMON9
Mode
Switch
Interface
Select
Switch
Interface
LEDs
USB
External
3.3V DC
Supply
External 12V
Supply
MachXO
LatticeMico8
Reset Switch