background image

6. Connect the Active, Neutral and Earth cables as per diagram below.

7. Push the socket back into the Main Body until it clips in.

8. Screw the Pressure Ring back in to form a tight seal.

9. Plug into PV Edge.

To disconnect the plug, simply push the clip in and unplug.

Note: The clip section can be completely taken out if a lockable connector
is not desired.

N

L

E

Neutral

Active

Earth

Socket

15

FAULT FINDING

HELPFUL HINTS

Should the Inverter appear to be malfunctioning we suggest the following to
eliminate any external problems.

Turn the Inverter OFF by switching the DC & external AC Circuit
Breakers OFF. Leave OFF for 60 seconds.

Reconnect the DC Solar Input by switching DC breaker ON. All lights
on the Inverter should come ON for 1 second at power up and then go
OFF. The 75% light should remain ON to indicate the Solar Input is
available. Solar Input voltage needs to be above the automatic turn ON
voltage, see pg 18, for the light to turn ON. If the light does not
illuminate check Solar Input for correct operation.

Next reconnect the AC grid by switching the external AC breaker ON.
After 20 seconds the 75% light should begin flashing to indicate Inverter
reconnecting to the AC grid. The light will flash for 60 seconds while the
PV Edge checks that the mains voltage and frequency are stable.
Should the light not begin flashing check if the AC grid is present.

After the 75% light stops flashing the Inverter will begin feeding power
into the AC Grid.

!

!

!

!

!

!

!

!

Make certain that you understand the operation of the Inverter.

Remember that it has automatic reconnection to the AC grid.

Make sure leads and terminals are not corroded, loose or faulty in any
way.

Make sure Circuit Breakers or switches are reset properly. If unsure
switch OFF and ON again.

6

Push to release

Содержание PV Edge Grid Connect

Страница 1: ...OSTED IN AUSTRALIA Ph 61 7 5491 6988 web www latronics com email technical latronics com A N E W W O R L D P O W E R A N E W W O R L D P O W E R REPLY PAID MB 1 LATRONICS PTY LTD P O BOX 73 MOFFAT BEA...

Страница 2: ...recautions for your new Power Inverter Please remember to complete and return your registration card on the last page of this manual to validate your warranty Please retain your receipt as proof of pu...

Страница 3: ...all 61 7 5491 6988 or email technical latronics com to obtain the address of your nearest service center and your RMA Number which is essential for efficient processing RMA Number Have you attached pr...

Страница 4: ...xceed rated values As the PV edge has a wall mountable enclosure ensure proper air circulation for cooling of the Inverter Safety DC solar input and AC grid are electrically and galvanically isolated...

Страница 5: ...Voltage 100V 200V Maximum Power Point 54VDC 100VDC Tracking Range Automatic Turn ON 70VDC 140VDC Automatic Turn Starting Operation 10W 10W Number of Modules 4x 12V modules or 8 x 12V modules Per Strin...

Страница 6: ...consequential loss or damage whatsoever whether based on tort or contract or otherwise Damage caused by unauthorised repair alteration or substitution of non standard parts incorrect installation misu...

Страница 7: ...invest significant time and effort in the reduction of RFI related emissions from the entire product range so that they comply with the appropriate International and or Australian Standards Even with...

Страница 8: ...should remain ON to indicate the Solar Input is available Solar Input voltage needs to be above the automatic turn ON voltage see pg 18 for the light to turn ON If the light does not illuminate check...

Страница 9: ...erefore the maximum power point and voltage variation with temperature are consistent for all modules which will ensure maximum system output SOLAR INPUT CONFIGURATION Panel Power At 25 C o 75W 90W 10...

Страница 10: ...bled and the voltage tracking will operate at a fixed voltage of 54V PVE1200 or 108V PVE2500 This setting is required in a system where a 48V PVE1200 or 96V PVE2500 Battery Bank is required on the DC...

Страница 11: ...erating point to ensure maximum power from the solar modules is achieved The AC grid supply is constantly monitored for under and over voltage over and under frequency and anti islanding conditions vi...

Страница 12: ...be OFF and this light will flash 75 Light AC Grid This light will be ON when the power level is between 50 75 This light also has 2 other modes of operation When in either of these 2 modes the bottom...

Отзывы: