BeamControl-Master
15
1
2
–
–
+
+
Inserting the batteries
Open the battery compartment and insert
the batteries in accordance with the installation
symbols, ensuring the correct polarity.
Batteries
When the red LED is permanently flashing, the battery must be changed.
Connection of an external power supply unit
When connecting an external power supply unit the batteries will be bridged. It is not
possible to charge storage batteries with the power supply unit in the rotation unit.
Please use only a suitable Laserliner mains unit.
Power supply
Working with the SensoCommander (optional)
The SensoCommander can recognise the laser beam
over long distances. Move the SensoCommander up
and down through the laser beam until the middle
display appears. Now mark the height on the all-round
marking groove. The Spotlite additionally shows the
measured height.
Universal mount (optional):
The receiver can be installed on levelling staffs with the aid
of the universal mount. To do this, insert the universal mount
into the laser receiver and secure on the levelling staff with
the aid of the screw. To release the universal mount from the
laser receiver, turn the quick release lock in the direction of
the arrow.
EN
Содержание BeamControl-Master
Страница 2: ...02...