immediately. It is best to send a confirming letter with the following information:
a. Freight bill number.
b. Date delivered - shipper's name & address.
c. Description of item(s) damaged.
d. Description of damage (a Polaroid picture if possible).
e. A copy of your invoice for the equipment.
4. After inspection, (before the inspector leaves):
a. Get a copy of the inspection report.
b. Request the unit be shipped back "free astray".
c. Request a credit for the original freight bill.
5. Call the factory and:
a. Get a Return Material Authorization (RMA number).
b. Give a purchase order for repair. The purchase order should refer to the item
and
trucker claim.
6. We will accept the shipment back, repair (under normal conditions) and return it within (7)
seven working days.
7. We will invoice the customer for the repair, which will then become part of your claim. The
invoice must be presented to the trucking claim department along with their claim form.
8. We suggest if the trucker does not pay within 30 days that you call and / or write the ICC
making a formal complaint of poor service. Also advise LaPlante Compressor Ltd. in
writing for follow-up.
If damage can be repaired at the receiving point, follow Procedure 1, steps 1 through
4a. Repair the unit and make out a detailed invoice to the trucker showing labor hours,
labor rate, materials used, and cost of materials.
2.5 Storage
In some cases it may necessary to store the compressor for extended periods of several
months before placing the unit in operation. When this is required do the following:
1. Cover and seal all machine openings to prevent the entrance of water and dirt.
2. Cover all openings in open drip proof motors to prevent the entrance of rodents.
3. If the storage conditions are below freezing, drain off the aftercooler, traps, water-cooled
heat exchangers and relative piping. We do not recommend outside storage.
4. Cover with a waterproof tarpaulin that can easily be removed for in storage maintenance.
5. While in storage, every two to three months rotate the compressor and motor by hand to
prevent flat spots on the bearings that will lead to premature failure.
At the end of the storage period, follow the uncrating and start-up procedures. If the unit has
been stored for more than eighteen months you should contact LaPlante Compressor Ltd.
before commissioning the compressor.
2.6 Installation Drawings (Recommended):
A minimum distance from walls, other machines, etc. should be maintained so that there is
sufficient clearance for maintenance and repair work ( refer to figure 2-2) .
We recommend a minimum duct cross-section of approx.
0.3
square meter. In order to ensure
a good heat dissipation, auxiliary fans should be rated to process approximately 15-20% more
air volume than the total cooling air quantity required by the compressors installed in the
compressed air station.
Содержание V120103-RS11
Страница 11: ...Operation manual 11 Rotation In Direction Of Arrow Emergency Stop Switch Stop Switch Start up Switch ...
Страница 17: ...Operation manual 17 Figure 2 2 Installation Drawings ...
Страница 25: ...Operation manual 25 Figure 4 8 Trouble Display ...
Страница 27: ...Operation manual 27 Figure 4 9 Alarming Display Figure 4 10 Parameter Display ...
Страница 41: ...Operation manual 41 ...
Страница 42: ...Operation manual 42 Figure 6 5 a the Electrical Drawing 230 Voltage ...
Страница 43: ...Operation manual 43 ...
Страница 44: ...Operation manual 44 Figure 6 5 b the Electrical Drawing 575 Voltage ...
Страница 59: ...Operation manual 59 ...
Страница 60: ...Operation manual 60 Electrical Main Parts List ...
Страница 61: ...Operation manual 61 9 2 LPRS11 575V the P N of LaPlante is 001118 001118 Exploded Drawing ...
Страница 62: ...Operation manual 62 001118 Parts List ...
Страница 63: ...Operation manual 63 Electrical Main Parts List ...