12
Lapierre Equipment |
FUSION X
2
EVAPORATOR
| USER MANUAL | Version 01 - September 2022
SECTION 3
Planning the installation of your evaporator (continued)
3.1.4 Preparing the location where the evaporator will be installed
You will be notified of the delivery date of your evaporator.
• Determine the exact location of the evaporator in the building.
• Before delivery date, make sure that all necessary work required for moving your evaporator to its final
location is completed.
3.2 RECEPTION INSPECTION
Here is a checklist to complete when you receive your evaporator.
3.2.1 Evaporator condition
• Check the condition of the evaporator as soon as it arrives.
• Although LAPIERRE EQUIPMENT applies rigorous quality control in the plant and before shipping, please
note, photograph and advise your LAPIERRE EQUIPMENT representative of any defects or imperfections
that may be observed on the day your equipment is received.
3.2.2
Purchase Order
• Have the purchase order on hand.
• Confirm by visual count that you have received all items such as concentrate, chimney and vent connectors
and all other items indicated on the purchase order.
• Also ensure that all items are in good condition.
3.2.3 Exact location of the evaporator in the building
Our staff will drop off the evaporator at the location you designate. It is important that the location is accurate.
Once on the ground, moving the evaporator is difficult and may cause damage to the evaporator and/or the
building.
Содержание FUSION X2
Страница 1: ...USER MANUAL September 2022 LAPIERRE EQUIPMENT All rights reserved 2022 FUSION X2 EVAPORATOR...
Страница 54: ...52 Lapierre Equipment FUSION X2 EVAPORATOR USER MANUAL Version 01 September 2022 NOTES...
Страница 55: ...53 Lapierre Equipment FUSION X2 EVAPORATOR USER MANUAL Version 01 September 2022 NOTES...