Revision 1.0
13
2.1 Installation Requirements
Basic requirements for installation are as follows:
Environmental conditions
One power outlet
Proper ventilation
Proper isolation to electrical noise, radio, etc.
UTP cables should not run in the same duct with power and phone line cables
Required SFP Transceiver or UTP cables
Rack mounting tools
2.2 Checking the Package Contents
Unpack the package carefully and check the package contents. The package should contain the
following items:
One set of the Managed Switch
19-inch rack-mount kit (Fixed in the Managed Switch when shipped)
Four rubber feet with adhesive backing
Console RS-232 cable with RJ-45 connector
AC power cord
If any item is found missing or damaged, please contact your local sales representative for support
or replacement.
Содержание LPGS-2424C Series
Страница 2: ......