18
Hardware Installation
In this paragraph, we will describe how to install the 6 10/100/1000T + 2
10/100/1000T/Dual Speed SFP Combo w/ Pro-Ring Managed Industrial Switch and the
installation points to be attended to it.
Installation Steps
1. Unpack the Industrial switch packing.
2. Check if the DIN-Rail is screwed on the Industrial switch or not. If not, please refer to
DIN-Rail Mounting
section for DIN-Rail installation. If user wants to wall mount the
Industrial switch, then please refer to
Wall Mount Plate Mounting
section for wall
mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall, please refer to the
Mounting Installation
section.
4. Power on the Industrial switch. Please refer to the
Wiring the Power Inputs
section
for knowing the information about how to wire the power. The power LED on the
Industrial switch will light up. Please refer to the
LED Indicators
section for indication
of LED lights.
5. Prepare the twisted-pair, straight through Category 5e/above cable for Ethernet
connection.
6. Insert one side of RJ-45 cable into the Industrial switch Ethernet port (RJ-45 port)
and another side of RJ-45 cable to the network device
‘s Ethernet port (RJ-45 port),
e.g. Switch, PC or Server. The UTP port (RJ-45) LED on the industrial switch will
light up when the cable is connected with the network device. Please refer to the
LED Indicators
section for LED light indication.
7. When all connections are set and LED lights all show in normal, the installation is
complete.
Содержание IGS-2206C
Страница 57: ...50 couplering no Xring dualhoming G Disable dual homing switch config no Xring dualhoming...
Страница 96: ...89 SNMP V3 configuration interface...
Страница 99: ...92 QoS Configuration interface...
Страница 112: ...105 System Reboot interface...