21
Installation
Positioning of the tubes according to the following installation diagram.
3.3.2 Set the individual sample volumes
3.3.2.1 Plastic dosing vessel
Figure 18 Installation diagram
5
jkl
6
mno
4
ghi
8
tuv
wxyz
9
7
pqrs
2
abc
3
def
1
0
Ex
H
2
S
6500
mm
[21.3
ft]
≤
≤
1000
mm
[40
in]
≥
≥
≤
30 000 mm
[100 ft]
≤
0–40 °C
[32–104 °F]
0–40 °C
[32–104 °F]
> 50 µs
Figure 19 Unlock the bayonet cap on the plastic dosing vessel
1
2
Содержание BUHLER 1027
Страница 2: ......
Страница 9: ...9 General Information Figure 3 Scope of delivery 1029 Figure 4 Scope of delivery 2000...
Страница 10: ...10 General Information...
Страница 34: ...34 Installation...
Страница 38: ...38 Operation...
Страница 42: ...42 Maintenance and cleaning Figure 47 Remove the dosing vessel Figure 48 Clean the dosing vessel...
Страница 46: ...46 Maintenance and cleaning...
Страница 51: ...51 Replacement parts and accessories Figure 56 Transportation trolley 1029 2000...
Страница 52: ...52 Replacement parts and accessories...
Страница 54: ...54 Warranty and Liability...
Страница 55: ...55 Section 8 Contact information...
Страница 56: ...56 Contact information...