background image

Lang Manufacturing Company

6500 Merrill Creek Parkway

Everett, WA  98203

Part #

Phone: 425-349-2400   Fax: 425-349-2733

Rev. A2002

WWW.LANGWORLD.COM

© Copyright 2002

Installation, Operation, & Maintenance

Model: PPP, 

Electric Air Door Pizza Oven

Содержание PPP

Страница 1: ...ring Company 6500 Merrill Creek Parkway Everett WA 98203 Part Phone 425 349 2400 Fax 425 349 2733 Rev A2002 WWW LANGWORLD COM Copyright 2002 Installation Operation Maintenance Model PPP Electric Air D...

Страница 2: ...SULT IN DEATH OR SERIOUS INJURY CAUTION POTENTIALLY HAZARDOUS SITUATION WHICH IF NOT AVOIDED MAY RESULT IN MINOR OR MODERATE INJURY NOTICE Helpful operation and installation instructions and tips are...

Страница 3: ...TABLE OF CONTENTS 3 READ FIRST 4 SAFETY PROCEDURES 6 EQUIPMENT DESCRIPTION 7 UNPACKING 8 INSTALLATION 9 INITIAL START UP 11 OPERATION 12 MAINTENANCE CLEANING 13 TROUBLE SHOOTING 15 ILLUSTRATED PARTS...

Страница 4: ...ge wattage serial number wire size and clearance specifications are on the data plate This information should be carefully read and understood before proceeding with the installation NOTICE The instal...

Страница 5: ...LANGWORLD COM For the service station nearest you WARNING BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE THIS APPLIANCE WHEN THE UNIT IS PLUGGED WIRED INTO A LIVE RECEPTACLE BEFORE REPLACING ANY PARTS...

Страница 6: ...tation standards The presence of safety equipment control and interlocks on an appliance and attendant components of installation cannot in and of themselves assure absolute safety of operation Dilige...

Страница 7: ...a 15 each 12 Pizza 12 each 14 Pizza 8 each 16 Pizza 6 each 18 Pizza 6 each Controls The oven power switch turns on the Air Door which is a gentle curtain of hot air that flows up across the oven openi...

Страница 8: ...QUIPMENT SUCH AS A FORKLIFT DOLLY OR PALLET JACK TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO THE PLACE OF INSTALLATION CAUTION ANY STAND COUNTER OR OTHER DEVICE ON WHICH OVEN WILL BE LOCATED MUST...

Страница 9: ...ns can be made through an 11 4 knockout in the bottom of the oven below the electrical controls Remove the cover attached to the oven circuit breakers for access Power connections can be made to the w...

Страница 10: ...gainst a non combustible back wall maintain a 6 inch clearance to the floor Do not install the oven closer than 4 inches from another oven on the right hand side control panel side Do not install the...

Страница 11: ...ing temperatures it must be thoroughly seasoned or dried out Moisture absorption in the closed spaces in the insulation and even inside the heating elements can cause future trouble if not properly tr...

Страница 12: ...ollow these directions 1 If product is overdone on the bottom tun the bottom switch down or the top switch up 2 If product is over done on the top turn top switch down or bottom switch up To select th...

Страница 13: ...n The stainless exterior can easily be cleaned using Lang Mfg Prime Shine 72804 41 oven cleaner Always follow the cleaner manufacturer s instructions when using any cleaner Care should be taken to pre...

Страница 14: ...3 cycles Red indicator light indicates when oven is calling for heat After 3 cycles average the temperature 5 F Add all six temperatures and divide by 6 Calibration Adjustment A 5 64 allen wrench will...

Страница 15: ...MPTOM POSSIBLE CAUSE Oven will not heat No power to Oven Internal breaker tripped Blown fuses Defective power switch Defective thermostat Defective contactor Defective 4 heat switch Defective oven ele...

Страница 16: ...RIBUTORS CAN CAUSE BODILY INJURY TO THE OPERATOR AND DAMAGE TO THE EQUIPMENT AND WILL VOID ALL WARRANTIES TESTS Possible Cause TEST Blown fuses No test available replace fuses Failed or tripped intern...

Страница 17: ......

Страница 18: ...PPP 480 Volt Middle 1500 Watts 11151 40 8 Motor 1 3 HP 480 Volt 30200 03 8A Motor 1 3 HP 208 240 Volt 30200 12 9 Blower Wheel 71500 01 10 Crumb Tray Nozzle Left Hand Right Hand 50301 65 11 Door Rod 1...

Страница 19: ...UL File E8138 Rev A 2002 19 WIRING DIAGRAM...

Страница 20: ...UL File E8138 Rev A 2002 20 THIS PAGE IS INTENTIONALLY LEFT BLANK...

Страница 21: ...eriod As to warranty service in the territory described above Lang will absorb labor and portal to portal transportation costs time mileage for the first 12 twelve months from the date of installation...

Отзывы: