background image

2M-W741 G

as F

ull S

iz

e C

omput

er

iz

ed C

on

vec

tion O

ven GCSF

1

GAS CONNECTION

Attach gas plumbing to the 3/8” NPTM fitting located on the right hand rear corner of the 

oven.  

WARNING

CONVECTION  OVENS  INSTALLED  WITH  CASTERS  MUST  HAVE  THE  FOLLOWING: 
A  CONNECTOR  THAT  COMPLIES  WITH  THE  STANDARD  FOR  CONNECTORS  FOR 
MOVABLE GAS APPLIANCES ANSI Z21.69 LATEST EDITION,  A QUICK DISCONNECT 
THAT COMPLIES WITH THE STANDARD FOR QUICK DISCONNECT DEVICES FOR USE 
WITH  GAS  FUEL, ANSI  Z21.141  LATEST  EDITION, A  TETHER  OR  OTHER  MEANS  TO 
LIMIT APPLIANCES MOVEMENT WITH OUT RELIANCE ON THE GAS SUPPLY PIPING.  
SECURELY ATTACHED THE TETHER TO THE EYEBOLT PROVIDED AT THE REAR OF 
THE APPLIANCE.

BEFORE LIGHTING, USE A SOAP AND WATER SOLUTION TO TEST ALL JOINTS FOR 
GAS LEAKS.

PRESSURE TESTING THE GAS SUPPLY LINE

During pressure testing note the following:

1.  The oven and its individual manual shut-off valve must be disconnected from the gas supply piping 

system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.45 kPa).  

Turn OFF

 main gas shut-off valve or main gas supply line.

2.  The oven must be isolated from the gas supply piping system by closing its individual manual shut-

off valve during any pressure testing of the gas supply piping system at test pressures equal to or 

less than 1/2 psig (3.45 kPa).

3.  If incoming pressure is over 12" water column,  a separate regulator for the oven must be installed 

before the gas supply to the oven. 

To  prevent  damage  to  the  control  valve  regulator  during  the  initial  turn-on  of 
gas, it is very important to open the manual shut-off valve very slowly.  After the 
initial gas turn-on, the manual shut-off valve must remain open except during 
pressure testing as outlined in the above steps or when necessary during service 
maintenance.

NOTE: The supplied regulator is evaluated for a maximum gas supply pressure of 
14" water column (34.5 mBar). The recommended maximum gas supply pressure 
is 12" water column (29.9 mBar). 

PRESSURE TESTING THE GAS CONTROL VALVE

Determine the outlet pressure is 4” W.C. by applying power to the valve 

and energizing both valve solenoids. Use the outlet pressure tap con-

nection on the underside of the valve body to monitor the outlet 

pressure. The outlet pressure tap is a bleed hole with a cast 

spigot, sealed with a threaded brass needle screw. 

To monitor the outlet pressure, turn the screw in a 

counterclockwise direction one or two turns 

and fit a 9 mm diameter flexible tube 

over the cast spigot. After mak-

ing all valve adjustments and 

 

obtaining the desired outlet 

pressure, remove the flexible 

tube. Tighten the needle screw 

by turning it clockwise with a 

slotted screwdriver until hand 

tight, sealing the bleed hole

.

UTILITY INSTALLATION

Outlet Pressure

Tap Connection

Pilot Tube

Connection

IL1407

Содержание GCSF-ES

Страница 1: ...GAS FULL SIZE COMPUTERIZED CONVECTION OVEN GCSF ES GCSF EZ Installation and Operation Instructions 2M W741 Rev D 11 11 13 GCSF_1 GCSF_2...

Страница 2: ...AD THE INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT WARNING RISK OF FIRE OR ELECTRIC SHOCK DO NOT OPEN WARNING TO REDUCE THE RISK OF ELECTRI...

Страница 3: ...DITIONS MAY DAMAGE YOUR LANG EQUIPMENT FAILURE TO PROPERLY TREAT WATER MAY RESULT IN DAMAGE AND MAY VOID SOME OR ALL OF THE WARRANTY WATER SPECIFICATIONS after treatment the water must continuously be...

Страница 4: ...standards MOST CLEANERS ARE HARMFUL TO THE SKIN EYES MUCOUS MEMBRANES AND CLOTHING PRECAUTIONS SHOULD BE TAKEN TO WEAR RUBBER GLOVES GOGGLES OR FACE SHIELD AND PROTECTIVE CLOTHING CAREFULLY READ THE W...

Страница 5: ...ng carrier Concealed damage or loss if damage or loss is not apparent until after equipment is unpacked a request for inspection of concealed damage must be made with carrier within 15 days Be certain...

Страница 6: ...rior to uncrating move the oven as close to its final location as practical This will protect it from damage associated with moving scratches dings dropping Some hardware i e casters legs stacking kit...

Страница 7: ...w A ventilation hood may be required to remove heat and cooking odors The hood and HVAC installation must meet local codes to gain approval by the authority having jurisdiction Requirements may vary t...

Страница 8: ...ing the unit Caster or Adj Foot Plywood Cardboard Control Panel UP IL1215 27 Legs These units may be placed on a curbed base CAREFULLY TILT OVEN ONTO ITS LEFT SIDE CONTROL SIDE UP WHEN INSTALLING LEGS...

Страница 9: ...o placing it into position DO NOT remove the knockout for the lower unit doing so will interupt proper gas venting from that unit 5 Using the Strapping Plates see stacking kit secure the two ovens tog...

Страница 10: ...polarity distinction between the single connections 6 Test the Inducer by plugging in the 120V connection to the oven upper oven on stacked assemblies and make sure the axial fan s on the draft induce...

Страница 11: ...e in the top part of the T for stacking the drains can be manifolded together with only the top drain vented ELECTRICAL CONNECTION All electrical connections must be made in accordance with local code...

Страница 12: ...less than 1 2 psig 3 45 kPa 3 If incoming pressure is over 12 water column a separate regulator for the oven must be installed before the gas supply to the oven To prevent damage to the control valve...

Страница 13: ...ime displays on LED Pulse Steam Sends Steam Shots in non adjustable 1 second duration to the cooking chamber Adjust the Pulse Steam time between 1 to 120 minutes by holding down the button and turning...

Страница 14: ...r light and display comes on b Set temperature to 300 F Verify Temperature Indicator light is blinking c Verify oven reaches set point signals Ready with an audible tone with in 12 Minutes starting wi...

Страница 15: ...rols section of this manual OCE OCG BACK UP CONTROLS Steam Toggle Switch Temperature Knob Control Toggle Switch IL1218 OPERATION WITH BACK UP CONTROLS During Back Up operation the main control panel i...

Страница 16: ...after approximately 108 seconds complete reversing cycle takes 2 minutes _____ f Verify the measured temperature at the transition point when heat contactor changes states matches the temperature on t...

Страница 17: ...m will be applied at the selected interval Set Cook n Hold Optional Cook n Hold light comes on to indicate feature is enabled Cooking timer times out Audible tone signals cook time complete If Cook n...

Страница 18: ...ounds from coming in contact with the fan wheel The oven racks rack slides may be cleaned outside the oven cavity using oven cleaner Using any harsh chemicals will result in the removal of the ETC coa...

Страница 19: ...unloading Cooking Curve 40 is the most commonly used Cooking Curve settings from 0 no time adjustment to 100 max time adjustment are available As a general rule the longer the cooking time the lower t...

Страница 20: ...e oven randomly Different times for different shelves load the oven from the center shelf out with even vertical spacing When loading multiple pans at the same time load the shelves spaced as equal di...

Страница 21: ...ture i e temperature loses during loading and unloading Cooking Curve 40 is the most commonly used Cooking Curve settings from 0 no time adjustment to 100 max time adjustment are available As a genera...

Страница 22: ...GRAM PRODUCT EDIT READY ZONE EDIT ACCESS CODE ENABLE MANUAL PRODUCT CONFIGURE TIME OF DAY Cancel Up Down Light On Off SELECT PRODUCT ICON USE KEYS TO SELECT THEN PRESS ENTER TO ACCEPT APPETIZER A ENTE...

Страница 23: ...r to the next space Cooking Curve may be any number between 0 and 100 Select ACCEPT to continue EnviroZONE PROGRAMING Cancel Up Down Light On Off SELECT FAN SPEED HIGH LOW USE KEYS TO SELECT APPLE TIE...

Страница 24: ...50 ACCEPT ENTER Step 15 Select Vent Start Minutes Press the to select the first digit then press ENTER to move to the next digit It will automati cally move to the next screen after the third digit Se...

Страница 25: ...5 4 3 2 1 A B C D E F G H I J K L T1 R PS F1 F2 S1 L1 L2 S2 W MV1 GND 37 GND 4 3 2 1 30 24 VAC CT 48 15 PIN OUTPUT CONNECTOR PIN 2 PIN 8 PIN 7 PIN 1 RTD PIN 1 32 PIN 3 46 36 PIN 2 PIN 15 PIN 14 PIN 13...

Страница 26: ...4 3 2 1 A B C D E F G H I J K L PS F1 F2 S1 L1 L2 S2 W MV1 GND R 32 SW7 GND MR3 VS1 SV1 LR1 SW6 CONTROL CIRCUIT BOARD GND MR1 SW1 MR2 SW3 SW2 SW4 SW2 SW2 LR1 LAMP4 LAMP3 LAMP2 LAMP1 MR3 MR2 MR1 DI2 DI...

Страница 27: ...0 70 23 69 75 4 1 14 128 9 119 119 125 86 87 21 85 IL1313 Rev 3 28 07 MODEL GCSF Main Exterior Assy THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO STAR MFG INT L INC NO REPRODUCTION OR DISCLOSURE O...

Страница 28: ...132 65 106 82 133 Circulation Fan 100 101 99 Interior Lights 89 90 Thermostat 11 11 12 109 108 Temp Probe IL1312 Rev A 6 10 08 MODEL GCSF Main Interior Assy THIS DRAWING CONTAINS INFORMATION CONFIDENT...

Страница 29: ...ol Panel Assy EnviroSTAR THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO STAR MFG INT L INC NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS IS PERMITTED 129 117 30 115 24 104 79 35 37 38 39 130 40 33...

Страница 30: ...130 40 33 34 93 27 131 91 137 95 97 40 94 98 31 113 IL1315 Rev 3 28 07 MODEL GCSF EZ Control Panel Assy EnviroZONE THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO STAR MFG INT L INC NO REPRODUCTION...

Страница 31: ...47 48 134 83 53 54 136 136 88 84 50 49 IL1317 Rev 3 27 07 MODEL GCSF Draft Inducer Assy THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO STAR MFG INT L INC NO REPRODUCTION OR DISCLOSURE OF ITS CONTEN...

Страница 32: ...56 58 130 57 81 EnviroZone Only 29 114 32 28 127 EnviroZone Only 5 8 7 EnviroZone Only 6 7 EnviroStar Only IL1319 Rev 3 28 07 MODEL GCSF Below Skin Level Assy THIS DRAWING CONTAINS INFORMATION CONFID...

Страница 33: ...F EZ Gas Full Size Convection Oven Parts List Rev D 11 11 2013 49 Q9 146 426 1 1 INDUCER MOTOR BRACKET ALL 50 Q9 146 426 2 1 INDUCER FAN ADAPTER PLATE ALL 51 Q9 146 427 1 1 INDUCER COVER ALL 52 Q9 146...

Страница 34: ...2 53 1 PIPE COUPLING 3 8X1 3 16 ALL 123 2K 70303 03 1 PIPE COUPLING 1 4 NPT ALL 124 2K 70305 05 1 PIPE 90o ELBOW 3 4 BLK ALL 125 2V 70402 07 1 VALVE MANUAL GAS 1 2X1 2 ALL 126 2V 70403 05 1 SOLENOID W...

Страница 35: ......

Страница 36: ...STAR INTERNATIONAL HOLDINGS INC COMPANY Star Holman Lang Wells Bloomfield Toastmaster 10 Sunnen Drive St Louis MO 63143 U S A 314 678 6303 www star mfg com...

Отзывы: