background image

 

 

page  4

 

P 800.521.2546  F 269.381.3455  www.landscapeforms.com 

7.  Connect the  solar panel to the power 

unit using the MC4 connectors .   

 
8.  Plug the luminaire into the LED     

driver(s) using the weatherproof con-
nectors. 

 

 

All electrical connections are complete at 
this point. 

 

9.  Switch the circuit breaker to the on 

position by pushing the plunger in 
until the white strip is no longer    
visible. 

10.  Switch the toggle switch to the on 

position 

 
10.  Before re-installing power module lid 

(removed in Step 1), Verify SOC 
charge LEDs per table 3. 

 
11.  After SOC has been verified, secure 

power module lid using six #10-32 
fasteners.  

 

The installation process is now complete. 

USE EXTREME CAUTION WHEN INSTALLING       

BATTERY HARNESS.  ALWAYS WEAR INSULATING 

GLOVES WHEN CONNECTING BATTERIES. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Kaleidoscope® smart shelter installation and maintenance manual

 

Installation  

 

Circuit breaker shown in the off 

position (white stripe visible). 

Circuit breaker shown in the on 

position (white stripe is hidden). 

Switch shown in the off position 

(Toggle pointed up). 

Switch shown in the on position 

(Toggle pointed down). 

Содержание Kaleidoscope smart shelter

Страница 1: ...Kaleidoscope smart shelter transit shelter solar lighting system installation and maintenance manual March 18 2019...

Страница 2: ...power unit should be mounted to the shelter roof 5 Mount Luminaire to interior of shelter by centering on roof arc see installation positions page 8 Drill and tap 20 hole in shel ter using luminaire b...

Страница 3: ...l splice so that the colors match the wires already con nected to the luminaire plug 4 Apply firm pressure to the button to make the connection and seal the opening Note At this point the luminaire is...

Страница 4: ...Before re installing power module lid removed in Step 1 Verify SOC charge LEDs per table 3 11 After SOC has been verified secure power module lid using six 10 32 fasteners The installation process is...

Страница 5: ...d direct spray into drain holes on power module lid The main housing has several drain holes Ensure that they are free of debris Visual inspection check over exterior assembly for cracks missing or br...

Страница 6: ...0 521 2546 F 269 381 3455 www landscapeforms com Note The 4 post unit uses one 2 post system and one 3 post system Kaleidoscope smart shelter installation and maintenance manual mechanical installatio...

Страница 7: ...rms Inc Printed in U S A OUR PURPOSE IS TO ENRICH OUTDOOR SPACES We believe in the power of design and its ability to influence and elevate the quality of public space High quality products and outsta...

Отзывы:

Похожие инструкции для Kaleidoscope smart shelter