![background image](http://html2.mh-extra.com/html/landice/l7-club/l7-club_service-manual_3548044086.webp)
Repair Procedures
Take-up Roller
86
7.18. Take-up Roller
1. Remove the motor cover.
2. Remove the screws from the rail covers as shown in the following figure.
Figure 7-20.
Side Rail Cover (same for left side)
3. Using a rubber mallet, gently tap up on the rail to remove it. Repeat for left side.
4. Remove the drive belt as outlined in “Drive Belt” on page
5. Use a 9/16” socket and ratchet to remove the bolts from the take-up roller on both sides.
Figure 7-21.
Treadbelt Tensioning Screws
6. Remove the take-up roller.
7. Installation is the reverse of removal.
Side Track
Screws
Содержание L7 Club
Страница 1: ...L7 L8 L9 Treadmill 90 Series Service Manual...
Страница 4: ...Grounding Instructions 4...
Страница 16: ...Introduction Recommended Tools 16...
Страница 26: ...Electrical Reference Harnesses 26...
Страница 30: ...Routine Maintenance Maintenance Checklist 30...
Страница 102: ...Replacement Parts 102 Figure 8 8 Control Panel 17 16 15 13 14 12 11 11 9 5 3 7 6 2 4 8 1...
Страница 116: ...Replacement Parts 116...
Страница 119: ......
Страница 120: ...111 Canfield Avenue Suite A 1 Randolph NJ 07869 1 800 LANDICE Tel 973 927 9010 Fax 973 927 0630 www landice com...