Section 5: Maintenance & Lubrication
RC(M)3715 & RCG(M)3715 Rotary Cutters 334-114M
1/26/21
53
Figure 5-14
33994
8-10 pumps
Zerk Located through slot in tube
CV Driveline without overrunning clutch
23556
8-10 pumps
CV Driveline with overrunning clutch
39280
4-5 pumps
2-3 pumps
2-3 pumps
4-6 pumps
CV Driveline without overrunning clutch
23556
CV Driveline with overrunning clutch
39280
4-5 pumps
2-3 pumps
4-6 pumps
2-3 pumps
CV Main Driveline Profile Tubes
With External Grease Point
CV = Constant Velocity
Type of Lubrication: Multi-purpose Grease
Quantity = 8-10 pumps
CV Main Driveline Joints
Type of Lubrication: Multi-purpose Grease
For instructions on how to access grease zerks shown
“Accessing CV Driveline Joints”
•
The constant velocity joint should be greased in a
straight position forcing grease through the passages
and into the cavity. After lubrication, grease should
be visible around the ball joints.
•
Grease fittings located on the u
-
joints, driveline
shields and overrunning clutch should be lubricated
every 8 Hrs of operation.
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
8
Hours
8
Hours
CV Main Driveline Shield Grease Point
Type of Lubrication: Multi-purpose Grease
Quantity = 2-3 Pumps
8
Hours