Section 1: Assembly & Set-up
RCB(M)5710 & RCB(M)L5710 Rotary Cutters 337-049M
7/9/20
27
Fold Lock Lugs Set-up
If the cutter is setup with a
Dual-Action Folding
Cylinder
and folding lock lug (#5) are arranged as shown
in Figure 1-22, then the lugs must be flipped around to be
like Figure 1-23. Follow steps 1-7 below to flip the lugs
around.
If the cutter is setup with a
Single-Action Folding
Cylinder
and folding lock lugs (#5) are arranged as
shown in Figure 1-23, then the lugs must be flipped
around to be like Figure 1-22. Follow steps 1-7 below to
flip the lugs around.
1. With the wing unfolded on a level surface, remove all
nuts (#1), lock washers (#2), flat washers (#3),
bolts (#4), and the two folding locking lugs (#5). Set
hardware aside for re-use.
2. On the wing deck, flip folding lock lugs (#5) length
wise to be arranged as noted below.
•
For a single-action cylinder, see Figure 1-22.
•
For a dual-action cylinder, see Figure 1-23.
3. Install locking lugs (#5) with existing 5/8"-11x1 3/4"
GR5 bolts (#4), flat washers (#3), lock washers (#2),
and hex nuts (#1). Hand tighten hex nuts (#1).
4. Once all hardware has been reinstalled, start tractor,
and fold the wing fully up.
5. Without relieving hydraulics, shut tractor down before
dismounting according to
6. Insert transport pin (#2) as shown in
7.
Secure locking lugs (#5) to the wing by tightening all
nuts (#1) to the correct torque.
Fold Lock Lugs (#5) Set-up For Single-Action Cylinder
Figure 1-22
Fold Lock Lugs (#5) Set-up For Dual-Action Cylinder
Figure 1-23
70546
74192
TAPERED
END
74191
TAPERED
END
Fold Lock Lugs
Figure 1-21
74189