![Land Pride QH05 Series Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/land-pride/qh05-series/qh05-series_operators-manual_3539432029.webp)
Section 3: Optional Equipment
QH05, QH16, QH20, & QH30 Quick Hitches 320-003M
7/15/22
25
Floating Top Link Positioning
Operating Position
Refer to Figure 3-4:
1. Park tractor and implement on level ground.
2. Adjust rear gauge wheel(s) to the correct working
height.
3. Lower implement with tractor’s 3-point lift until the
front is at the correct working height. Rear gauge
wheel(s) should be on the ground supporting the
implement’s rear end. If not, lengthen tractor’s
3-point top center link until the rear end is supported
by the gauge wheel(s).
4. With implement set at the correct working height,
adjust 3-point top center link until the floating top two
links dip halfway down into the upper hook as shown.
Transport Position
Refer to Figure 3-5:
The floating top links should be straight as shown when
implement’s gauge wheel(s) are raised off the ground.
NOTE:
Refer to implement’s operating manual for a
complete description on how to set the implement to
the correct working height.
Floating Top Link Position When
Tail Wheel & Skid Shoes Are On The Ground
Figure 3-4
Floating Top Link Position When
Tail Wheel & Skid Shoes Are Off The Ground
Figure 3-5
22159
IMPLEMENT TOP LINK
FLOATING TOP LINK
3-POINT TOP
CENTER LILNK
22141
IMPLEMENT TOP LINK
FLOATING TOP LINK