background image

S8E V3 Hi-Carb Superchiller 

230V / 50Hz  

 

 

www.lancerbeverage.com 

Page 7 of 27 

Hoshizaki Lancer reserve the right to change specifications without notice. 

Part No: 68000021 

Images are for illustration purposes only as product may vary. 

No 043-3 – 19 December 2019 

 

 

Caution 

Superchiller operational weight is 394kg; ensure that all supporting 

structures are certified for this loading by a registered Mechanical 

Engineer.  

Supporting structure must be securely fixed to floors or walls.

 

 

3.5  Connecting Python 

Connect Python to Chiller and Dispenser. 

 

 

Caution 

NOTE: The S8E Superchiller is rated to operate with a maximum of 

90m of python connected at 32

°C

.  

Exceeding manufacturer’s ratings may cause damage to the 

Superchiller and void warranty. 

 

Connect the Python to Chiller and Dispenser. 
Refer to Python and Dispenser specifications for connection data. 
Superchiller can be supplied with 4 or 5 pumps, dual carbonator, or 3 pumps single carbonator; 

python should be connected to Chiller as follows: 

5 Pump 

 

4 Pump 

3 Pump 

 

 

 

 

 

 

 

 

 

SODA 

RETURN A 

WATER 

RETURN 

SODA 

RETURN B 

 

SODA 

RETURN A 

SODA 

RETURN B 

 

SODA 

RETURN A 

WATER 

RETURN 

SODA 

SUPPLY A 

WATER 

SUPPLY 

SODA 

SUPPLY B 

 

SODA 

SUPPLY A 

SODA 

SUPPLY B 

 

SODA 

SUPPLY A 

WATER 

SUPPLY 

 

Important:

 Ensure lines from python to Superchiller connections are insulated to prevent 

condensation. 

Note:

 For additional Soda reserve on short python lengths used in high volume accounts, it 

may be necessary to extend the soda circuit by connecting the 2 spare lines in the python onto 

the soda return line (i.e. double pass of soda circuit out and back from dispense point to soda 

return). 

3.6  Connecting to water supply 

  Using appropriate tubing and fittings connect a 10mm water supply line from Superchiller 

carbonator pump inlet to a filtered, regulated water supply. (See Postmix circuit diagram 

page 11-13). Installation in accordance with AS/NZS 3500.1 and AS/NZS 3500.2. 

  Turn on water supply, check for leaks, adjust water regulator to 172-275kpa. 

S

 

O

 

D

 

A

 

S

 

U

 

P

 

P

 

L

 

Y

 

S

 

O

 

D

 

A

 

R

 

E

 

T

 

U

 

R

 

N

 

1

 

0

 

m

 

m

 

'

 

U

 

'

 

B

 

E

 

N

 

D

 

P

 

Y

 

T

 

H

 

O

 

N

 

Содержание S8E V3 Series

Страница 1: ...www lancerbeverage com S8E V3 Hi Carb Superchiller 230V 50Hz Installation Operation Service Manual...

Страница 2: ...erbeverage com Page 2 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 Decemb...

Страница 3: ...with water 8 3 9 Electrical Connection 8 3 10 Plumbing the drain and CO2 exhaust 8 3 11 Commissioning 8 3 12 Purge System 9 3 13 Sanitise System 9 4 Scheduled Maintenance 9 4 1 Daily 9 4 2 Quarterly 9...

Страница 4: ...80 litres Construction Stainless Steel Compressor Danfoss x 2 Agitator Motor 12W 230 VAC 1 Phase Condenser Motor 20W 230 VAC 1 Phase Ice bank Control Electronic Carbonation Level Control Electronic Dr...

Страница 5: ...n injury or equipment damage 2 3 Operating Warning Superchillers are intended for indoor operation only do not operate outside unless suitably protected by a weatherproof enclosure This appliance is n...

Страница 6: ...m with the carrier 3 2 Unpacking Caution The use of gloves is recommended to protect hands from potential injury from sharp edges The Superchiller must always be handled in a vertical position Careful...

Страница 7: ...carbonator or 3 pumps single carbonator python should be connected to Chiller as follows 5 Pump 4 Pump 3 Pump SODA RETURN A WATER RETURN SODA RETURN B SODA RETURN A SODA RETURN B SODA RETURN A WATER R...

Страница 8: ...requires a separate 10 amp Postmix and a 15amp Refrigeration power supplies Check the name plate on the machine for electrical supply requirements Use only the power supply specified on the name plate...

Страница 9: ...nnects and re connect disconnects to appropriate BIB s Operate dispensing valves until syrup flows freely 4 Scheduled Maintenance The following Superchiller routine maintenance should be performed at...

Страница 10: ...res per minute replace pump Commission and purge system as per clause 6 11 and 6 12 4 5 Sanitisation of Beverage System To maintain optimum quality of dispensed product each Superchiller and its assoc...

Страница 11: ...age 11 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 December 2019 5 Postm...

Страница 12: ...of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 December 2019 5 2 Twin Carb...

Страница 13: ...13 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 December 2019 5 4 Twin Ca...

Страница 14: ...om Page 14 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 December 2019 6 E...

Страница 15: ...lancerbeverage com Page 15 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19...

Страница 16: ...z www lancerbeverage com Page 16 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043...

Страница 17: ...if necessary fit burnout drier to industry standards Compressor short cycling on thermal overload frequent starting and stopping of the compressor while ice bank control contacts remain closed Dirty...

Страница 18: ...aper cups Dirty or greasy glasses Improperly drawn drink Check carbonator control using procedure on page 21 Replace control or probe if defective Check filters Check CO2 pressure at regulator Should...

Страница 19: ...ll not run due to excessive carbonator CO2 pressure Faulty low pressure switch Defective Carbonator motor Locked up pump Motor has cut out on overload Carbonator empty faulty control board or level pr...

Страница 20: ...VAC is present on terminals N A ON 1 ON 2 terminals Work should only be performed by fully trained certified Electrical Plumbing Refrigeration Technicians 1 Remove the ice bank probe connections from...

Страница 21: ...ning 230VAC is present on terminals N A ON 1 ON 2 Work should only be performed by fully trained certified Electrical Plumbing Refrigeration Technicians 1 Remove the carbonator probe connections from...

Страница 22: ...9 BACKFLOW PREV ANDERSON 6 08000002 CARBONATOR RELIEF VALVE 7 63000163 COIL ASSY PRECHILL B 8 87000052 STRAINER FLOW INDICATOR 10 63000164 COIL ASSY SODA A 11 63000165 COIL ASSY SODA B 12 63000205 COI...

Страница 23: ...lancerbeverage com Page 23 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 D...

Страница 24: ...8 83000324 ELECTRICAL BOX ASSY 4P 5P S8E V2 83000325 ELECTRICAL BOX ASSY 3P S8E V2 9 83600811 MINI CONTACTOR C15 9 DANFOSS 10 83000278 CONTROL LEVEL I B HYDRA R2 11 83000282 COMPRESSOR START RELAY AN...

Страница 25: ...cerbeverage com Page 25 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000021 Images are for illustration purposes only as product may vary No 043 3 19 Dece...

Страница 26: ...of the Divisional Sales Manager Lancer may choose to reimburse the customer for some or all labour costs associated with a warranty claim Any claim for labour costs must be authorized by Lancer prior...

Страница 27: ...nd pumps secured and mounted correctly in correct locations All pumps run quietly and carbonator pump switched ON OFF Check icebank probe position and tightness and correct wiring of harness Carbonato...

Отзывы: