
13
BREwER INSTALLATION & TESTING
Testing
Once BREW EXPRESS has been installed into the rough-in-box it must be tested to ensure proper operation.
1.
Turn on electrical power and power switch (located on top of brewer). The brew button icon should be illuminated.
If the button icon is not illuminated, refer to the troubleshooting section of this manual.
2.
Turn on water supply to BREW EXPRESS. There should be no leaks in the water connections. If water is
leaking, pull the brewer from the wall, check connections and refer to the troubleshooting section of this manual
to make appropriate corrections. If water is leaking from inside the brewer, disconnect from the rough-in-box
and contact customer service.
Test the Brewer
1.
Place empty brew basket in unit.
2.
Place the empty carafe under brew basket.
3.
Press the “Brew” button.
4.
After a moment water will begin flowing and remain on for approximately 140 seconds.
5.
A Beeper will sound 40 seconds after water stops flowing.
If the operation does not occur, see the troubleshooting guide in the next section of this manual.
For more detailed information regarding operation, see the OPERATION GUIDE.
9. Gently slide the
BREW EXPRESS
into the rough-in-box.
Be careful not to damage water supply lines. A firm push will
connect power from rough-in-box to the BREW EXPRESS.
Use two mounting screws to secure BREW EXPRESS
to rough-in-box. Note, some models will have an “L” bracket
NOTE: Refer to OPERATION GUIDE for further instructions
before using BREW EXPRESS.
WARNING:
Do not caulk or grout to brewer.
MOUNTING
SCREWS
Содержание Brew Express BE-104C
Страница 2: ......