
2.69m - Maximum Height Set-Up (= ‘Extractor body’ fixing)
Build ceiling plate and struts to c.1016mm
Struts length set to c. 957mm (*100mm minimum strut overlap is necessary)
2.46m - Minimum height for ‘Extractor body’ fixing
Build ceiling plate and struts to c.780mm
Struts length set to c. 715mm
Note:
Lowest strut jointing nuts and bolts need to be set
c.270mm from the bottom of the strut to allow fixing to extractor body.
* Remove any loose / dropped screws and nuts etc to avoid possible vibrations / rattles
*Struts must have min. 100mm overlap
Ceiling plate with struts fasten to the ceiling, chimney sections are placed over the struts
and secured. Extractor body and glass is lifted to struts and secured. Chimney section lowers.
1.
2.
3.
4.
Page _ 17
Installation - Building & Fixing Your Extractor