
1
2
3
www.howdens.com
Page _ 10
LAMONA
Appliances
Hanging your extractor
This instruction must be strictly adhered to. Failure to comply could result in overheating and
serious damage to your appliance. It is recommended that the installation is carried out by two people.
Before drilling or chiselling the ceiling or wall, check for pipes and power cables.
Ensure extractor is installed level above the worktop.
•
If ducting externally ensure the ducting tube is kept as short as possible and with the minimum
of bends to permit the smoothest
(Maximum length 3 metres.). Ducted air must not be
discharged into a
which is used for exhausting fumes from appliances supplied with energy other
than electricity. (E.g. gas boilers)
•
Ensure the requirements of the local authorities are adhered to concerning the discharge of exhaust
air.
•
Ensure adequate room ventilation is provided when the extractor is used in the same room as
appliances supplied with energy other than electricity.
•
Never duct into a hot air
such as a central heating duct
1. Remove the grease
before trying to install.
2. The recommended
height for the hood is 700mm above the
hob. This can be reduced to
a minimum of 465mm above the top of the hob if required.
3. Mark and drill the holes required to mount the extractor body, fit the screws in holes (
A
).
4. With the help of an assistant, hang the extractor body on the upper screws (
A
) and secure in position
with the lower mounting screw (
B
).
316mm
465 min.
465 mi
n.
260mm
Gas
Electric
370mm
108mm
A
A
A
A
A
B
B
B
380mm Max
Duct = 20mm Min
Recir = 170mm Min