![LAMI Daisy-55EC Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/lami/daisy-55ec/daisy-55ec_instruction-manual_671622013.webp)
Cold Laminate Processing
1
Install the paper tube holder on the film shaft.
All 6 film shafts are common parts.
Use hex wrench to move or fixate the branch pipe holder.
2
Install the under-film.
Refer to the figure below to pass the under-film while laminate roller (top) is lifted.
3
Install the laminate film.
Pass the laminate roller through the under roller with the release paper attached and then put down the laminate
roller.
+PUVCNNCVKQPCPF2TQEGUUKPIQH%QNF.COKPCVG(KNO
Fixate
4
sides
of
each
branch pipe holder.
Under-film
Laminate film
ձ
Idle roller (front)
эղ
front signboard
эճ
laminate roll
эմ
back signboard
Under-film