INSTALLATION
- 22
-
INSTALLATION INSTrUCTIONS
CAUTION!
•
The installation and maintenance of pyrolitic boilers is done only by a specialized firm authorized to carry out such activities.
•
The installation of the boilers requires the preparation of a preliminary project that complies with the active norms and
prescriptions.
•
The joining of the boiler with the heating installation is done only by a qualified technician.
•
When installing the boiler, one should raise its lower part by 10 mm.
- The boiler’s construction allows its connection to a heating installation with a maximal work pressure of 200 kPa (2 bar)
and a maximal temperature of the outgoing water of 95 degrees Celsius, with forced or gravitational circulation.
- The installation must be done in a special room over a non-flammable material with a minimal height of 50 mm, and a
constant access of air for burning must be present via an opening with a minimal area of 0,4 m2 (20cm x 20cm).
- The connection between the boiler and the chimney must also be made of non-flammable material, mechanically robust,
reliably tight, with a diameter no less than the diameter of the chimney.
- Its length should be no more than one meter and it should have an upward slope from the boiler to the chimney.
- The joining dimensions of the exit and entrance to the heat installation can be seen on sketch 1.
- The cricket under the entrance for the incoming water can be used for the installation of a tap or it can be blocked.
- The tap serves for filling in or emptying the water from the boiler and the installation.
- During the process of filling, the pressure of the water must not exceed 350 kPa.
- It is recommended to connect the boiler to a system with a 4-way mixing valve, the purpose of which will be to maintain
the temperature of the water in the boiler around 70 degrees Celsius.
- If the client wishes, a pellet burner can be attached to the boilers with heat capacity of 25 and 32 kW.
If this is the case, here is what must be done:
1) Remove the existing lower door.
2) Install the door with an entrance to the pellet burner and regulation of the door’s hinges.
3) Install the pellet burner at the lower door.
- The burner is placed at the door entrance with the corresponding tightness.
It is attached with nuts, under one of which a
SPECIAL “L”- SHAPED METAL PART
is attached, which presses against
the final switch, thus giving information that
THE BURNER IS INSTALLED
.
It is absolutely forbidden to eliminate this protection, as it is directly connected with fire safety measures.
- When installing the burner, it must be heeded that the system is in proper position (leveled).
The hose must be stretched and the braces tight.
- After the burner is mounted to the boiler, it must be plugged in the electric mains, according to the supplied diagram.
Special attention must be paid to the protective grounding of the installation.
- The fuel transporter is connected to the burner by a special plug and contact, and is controlled by a specific algorithm
(the burner has two contacts, CAUTION!)
THE LOWER CONTACT IS ALWAYS UNDER VOLTAGE AND SERVES FOR PRIMARY LOADING OF THE FUEL
TRANSPORTER,
and the other is for normal operation.
240
240
155
33
ø152
G1/2”
640
1020/1100/1300
560/640/840
11
36
296
186
1040
1350
10
0
680
255
10
G6/4
”
G6/4
”
G3/4
”