background image

9

Externa 30 O

Cod. 3540T540 - 04/2009  (Rev. 00)

Pressure relief valve

Externa 30 O

 incorporates a pressure relief valve discharging at 300 kPa.

The discharge of the pressure relief valve must be con nected to a collection container, to avoid 
water spill ing onto the ground in the event of over-pres sure in the central heating circuit. The 
manufacturer of the boiler will not be held liable if this warn ing is not heeded, and the discharge 
valve in tervenes and floods the room.

Characteristics of the system water

In the case of water with hardness above 25 French degrees, the water should be suitably treated, 
to avoid any deposits in the boiler caused by hard water, or corrosion caused by aggressive water. It 
should also be remembered that even minor deposits measuring just a few millimetres thick can cause, 
due to their low thermal conductivity, significant overheating of the walls of the boiler, with consequent 
serious problems.
The water must always be treated in the case of very large systems (with high water capacity) or sy-
stems with the frequent inlet of recovered water. If, in these cases, the system needs to be partially or 
completely emptied, it must be refilled with treated water.

Filling the boiler and the system

The boiler is fitted with a ball cock for manually filling the central heating system. The filling pressure, 
when the system is cold, must be around 1 bar. If the pressure drops during operation (due to the eva-
poration of the gas dissolved in the water) to a value lower than the minimum described above, the User 
must restore the initial value using the filling cock. For correct boiler operation, the pressure, when hot, 
must be around 1,5÷2 bar. Once the operation is completed, always close the filling cock.

2.4 Gas connection

Before making the connections, check that the appliance is configured for operation with the 
type of fuel available, and carefully clean all the gas pipes in the system, to remove any residues 
that may affect the correct operation of the boiler.

The gas connections must be made at gas inlet (see fig. 3 - key 3), with a rigid metal pipe, or a stainless 
steel flexible continuous-wall pipe, fitting a gas cock between the system and the boiler. Before instal-
lation, mount the threaded adapter ISO 7-1 contained in boiler package, as shown in fig. 3b. Check that 
all the gas connections for tightness.
The capacity of the gas counter must be sufficient for the simultaneous use of all the connected appliances. 
The diameter of the gas pipe, which leaves the boiler, does not necessarily determine the choice of the 
diameter of the pipe used between the appliance and the gas counter; this must be chosen according 
to its length and the pressure drop, according to the standards in force.

Do not use the gas pipes as the earth for electrical appliances.

2.5 Electrical connections

Connection to the mains power supply

The boiler should be connected to a single-phase, 240 Volt-50 Hz electrical line.

The electrical safety of the appliance is ensured only when the appliance is correctly connected 
to an effective earth system, as prescribed by the safety standards in force. Have professionally 
qualified personnel check the efficiency and the rating of the earth system. The manufacturer 
is not liable for any damage caused by the appliance not being correctly earthed. In addition, 
make sure that the electrical system is adequately rated for the maximum power absorbed by 
the appliance, indicated on the boiler rating plate, and in particular that the cross-section of the 
wires is suitable for the power absorbed by the appliance.

The boiler is pre-wired and fitted with a cable for connection to the electrical line. The connections to 
the mains supply must be made using a fixed connection, featuring a two-pole switch with a contact 

Содержание Externa 30 O

Страница 1: ...WALL HUNG GAS FIRED SEALED BOILER FOR CENTRAL HEATING OPERATING INSTALLATION AND MAINTENANCE INSTRUCTIONS cod 3540T54 0 04 2009 Rev 00 7 Externa 30 O...

Страница 2: ...ations disconnect the appliance from the mains power supply using the system switch and or the corresponding on off devices In the event of faults and or poor ope ration of the appliance it should be...

Страница 3: ...2 2 Place of installation 7 2 3 Water connections 7 2 4 Gas connection 9 2 5 Electrical connections 9 2 6 Flues 11 3 SERVICE AND MAINTENANCE 12 3 1 Settings 12 3 2 Commissioning 14 3 3 Maintenance 15...

Страница 4: ...er pressure switch temperature sensors and safety thermostat The microprocessor based control system means that the operation of the appliance is almost comple tely automatic The central heating outpu...

Страница 5: ...r and the central heating system alternatively drain only the domestic hot water and place the special antifreeze fluid in the central heating system 1 4 Settings Summer Winter setting and system temp...

Страница 6: ...d at least biennial checks on the combustion device Please refer to Chap 3 3 in this manual for further information The casing the control panel and the aesthetic parts of the boiler can be cleaned us...

Страница 7: ...all must provide stable and effective support of the appliance Upon request a metal wall drilling template is available This is used exclusively to trace the holes for fastening the appliance onto the...

Страница 8: ...the system In the boiler From the system In the boiler In the boiler From the system A F C D E F E D B C A Connection with cocks Connection with nipples A Female pipe coupling C OR gasket D OT 58 stop...

Страница 9: ...ons check that the appliance is configured for operation with the type of fuel available and carefully clean all the gas pipes in the system to remove any residues that may affect the correct operatio...

Страница 10: ...3 mm Max 3A fuses must be installed between the boiler and the line The correct polarity must be followed PHASE brown wire NEUTRAL blue wire EARTH yellow green wire in the electrical connections If t...

Страница 11: ...on of the boiler it is necessary to mount the concentric terminal followiong instruc tioins below 1 Mount and fix boiler on the wall 2 Insert rubber gasket on terminal 3 Insert terminal on appliance c...

Страница 12: ...pressures in the burner ref corresponding paragraph setting the values indicated in technical data table for the type of gas used 3 Change the position of Jumper 02 on the electronic board ref corres...

Страница 13: ...5 Factory set do not tamper X6 X1 X2 X3 X4 1 2 1 2 1 3 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 2 1 X5 L1 L2 L3 L4 L5 Transformer P2 DHW X12 1 2 P3 P5 P4 JP02 JP01 JP03 1 2 3 4 5 6 7 8 9 X10...

Страница 14: ...ntenance operations which may have required the disconnection from the systems or intervention on the safety devices or parts of the boiler Before igniting the boiler Open any on off valves between th...

Страница 15: ...pening a hot water tap the heating pump switches off the domestic hot water pump starts and there is regular production of domestic hot water Shut down Close the gas cock upstream of the boiler and di...

Страница 16: ...tats gas valve and circulation pump After these checks ensure that there are no gas leaks Analysis of combustion Two test points are installed inside the boiler one for the flue gases and the other fo...

Страница 17: ...5 bar Check water pressure switch wiring connection NO Does fan run at full speed NO Go to CHART 2 NO YES Does CH Pump run If the boiler temperature is less than 5 C frost protection is activated Dis...

Страница 18: ...eck limit thermostat YES Check pump wiring connection NO Check and if necessary replace pump Does fan run Is relay RY100 switch ON NO Go to charts 2 NO Is 230V present across fan terminals YES Check a...

Страница 19: ...r light now Is flame present before lockout condition NO YES NO Check and if necessary replace safety thermostat Check electrodes and leads for damage and correct connection Check and if necessary rep...

Страница 20: ...09 Rev 00 4 CHARACTERISTICS AND TECHNICAL SPECIFICATIONS 4 1 Dimensions and fittings fig 7 Key 1 CH flow 2 Filling cock 3 Gas inlet 4 CH return Top View Bottom View 99 85 428 850 96 158 270 236 5 326...

Страница 21: ...49 50 7 11 74 44 14 19 187 22 82 81 36 20 21 26 27 114 34 Threaded adapter ISO 7 1 27 Copper heat exchanger 28 Flue collector from heat excanger 32 Central heating pump 34 Central heating temperature...

Страница 22: ...l heating outlet 11 Central heating inlet 16 Fan 20 Burner assembly 29 Flue gas outlet manifold 32 Central heating pump 34 Central heating temp sensor 43 Air pressure switch 44 Gas valve 49 Safety the...

Страница 23: ...Maximum central heating operating temperature C 100 Index of protection IP X5D Power supply Power supply voltage frequency V Hz 240 50 60 Max Power Absorbed W 125 Central heating system fittings inche...

Страница 24: ...ure drop Discharge head available to system fig 10 fig 11 kW kPa 18 19 20 21 22 23 0 5 1 0 1 5 2 0 2 5 3 0 3 5 9 10 11 12 13 14 15 16 17 8 24 25 26 27 28 29 30 31 32 33 34 Universal LP Gas Natural Gas...

Страница 25: ...9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 2 1 X5 TEST X12 1 2 1 2 3 4 5 6 7 8 9 X10 W O V R X8 X7 81 82 PMF03F JP02 JP01 JP03 Nat LPG X11 240V 24V 240V 24V BR Blue BR Blue BR Blue MV1 MV2 MV3 MV4 Blue BR Blu...

Страница 26: ......

Страница 27: ......

Страница 28: ...Ferroli spa 37047 San Bonifacio Verona Italy Via Ritonda 78 A tel 39 045 6139411 fax 39 045 6100933 www ferroli it...

Отзывы: