- 28
-
EM 6N ST-E
GB-E 05
5-1/
2"(Pi)
Thermal output
Pressure loss (mbars)
Legend
Pi Inlet pressure (combustion head + gas train)
Pt Pressure at combustion head
ASSEMBLY ONTO THE BOILER
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4. Insert the burner in the flange so that the
draught tube penetrates into the combustion chamber by the length suggested by the boiler manufacturer. Tighten bolt 1
to lock the burner in position.
Содержание EM 3 ST-E
Страница 2: ......
Страница 21: ...21 ITALIANO...
Страница 39: ...39 ENGLISH...
Страница 57: ...57 FRAN AIS...
Страница 75: ...75 DEUTSCH...
Страница 93: ...93 ESPA OL...
Страница 100: ...100 EM 6 ST E GB E 055 1 2 Pi mbar fi Pi fi Pt 2 4 3 4 fi 1...
Страница 101: ...101 fi A fi B fi C D EM 6N ST E EM 3 ST E fi fi fi fi fi fi fi fi fi fi fi fi...
Страница 102: ...102 fi fi fi S3 fi fi B4 MPE 230V 50Hz fi EC fi F FA IG fi fi MB MPE PA PGm TC TR TS VP VS 2 fi fi fi 3 mm 20 mm...
Страница 104: ...104 3 sec 3 sec LME fi fi fi fi fi fi fi fi fi fi fi fi fi 10...
Страница 105: ...105 fi A B fi fi A C fi fi MAX fi fi fi fi fi fi fi fi fi fi MULTIBLOC MB DLE B01 1 2 3 4 4 2 fi fi 4 fi fi...
Страница 110: ...110 1 A B A B 2 fi A B C A B C fi 3 fi A fi fi A...
Страница 111: ......