- 32
-
G
H
I
ASSEMBLY ONTO THE BOILER
Fix flange
2
to the boiler using 4 screws
3
interposing the insulation gasket
4
and the possible insulating cord
5
. Insert the
burner in the flange so that the draught tube penetrates into the combustion chamber by the length suggested by the boiler
manufacturer. Tighten screw
1
to lock the burner in position.
Before the final locking it is necessary to check that the draught tube get some centimeters into the chamber beyond the
tube nest.
MODEL
G
Ø H
I
min.
max.
EM 16/M-E
155
150
200
M8
EM 26/M-E
155
170
225
M10
to direct turn
to upsetting