Lamborghini Caloreclima 0DAC4ZYD Скачать руководство пользователя страница 7

FL D C

7

EN

cod. 3541P520  -  Rev. 00  -  06/2018

Notes:

1.

Parameters with more than one description vary their function and/or range in rela-
tion to the setting of the parameter given in brackets.

2.

Parameters with more than one description are reset to the default value if the pa-
rameter given in brackets is modified.

3.

The Maximum Heating Power parameter can also be modified in Test Mode.

Press the Reset button to return to the Service Menu. Press the Reset button for 20 sec-
onds to exit the card Service Menu, or exiting occurs automatically after 15 minutes.

“In” - Information Menu
PAR_INFO

 pieces of information are available.

Press the Heating buttons to scroll the list of information in increasing or decreasing or-
der. Press the DHW buttons to display the value.

Notes:

1.

In case of damaged sensor, the card displays hyphens.

Press the Reset button to return to the Service Menu. Press the Reset button for 20 sec-
onds to exit the card Service Menu or exiting occurs automatically after 15 minutes.

"Hi" - History Menu

The card can store the last 11 faults: the History datum item H1: represents the most re-
cent fault that occurred; the History datum item H10: represents the least recent fault that
occurred.
The codes of the faults saved are also displayed in the corresponding menu of the Re-
mote Timer Control.
Press the Heating buttons to scroll the list of faults in increasing or decreasing order.
Press the DHW buttons to display the value.
Press the Reset button to return to the Service Menu. Press the Reset button for 20 sec-
onds to exit the card Service Menu, or exiting occurs automatically after 15 minutes.

"rE" - History Reset

Press the Eco/Comfort button for 3 seconds to delete all the faults stored in the History
Menu: the card will automatically exit the Service Menu, in order to confirm the operation.
Press the Reset button for 20 seconds to exit the card Service Menu, or exiting occurs
automatically after 15 minutes.

4.2 Commissioning
Before lighting the boiler

Check the seal of the gas system.

Check correct prefilling of the expansion tank.

Fill the water system and make sure all air contained in the boiler and the system
has been vented.

Make sure there are no water leaks in the system, DHW circuits, connections or boiler.

Check correct connection of the electrical system and efficiency of the earthing system.

Make sure the gas pressure for heating is that required.

Make sure there are no flammable liquids or materials in the immediate vicinity of
the boiler

B

IF THE ABOVE INSTRUCTIONS ARE NOT OBSERVED THERE MAY BE
RISK OF SUFFOCATION OR POISONING DUE TO GAS OR FUMES ES-
CAPING; DANGER OF FIRE OR EXPLOSION. ALSO, THERE MAY BE A
RISK OF ELECTRIC SHOCK OR FLOODING THE ROOM.

Checks during operation

Switch the unit on.

Check the tightness of the fuel circuit and water systems.

Check the efficiency of the flue and air/fume ducts while the boiler is working.

Make sure the water is circulating properly between the boiler and the systems.

Make sure the gas valve modulates correctly in the heating and domestic hot water
production stages.

Check correct boiler lighting by performing various tests, turning it on and off with
the room thermostat or remote control.

Make sure the fuel consumption indicated on the meter matches that given in the
technical data table in cap. 5.

Make sure that with no demand for heating, the burner lights correctly on opening a
hot water tap. Check that in heating mode, on opening a hot water tap, the heating
circulating pump stops and there is regular production of hot water.

Make sure the parameters are programmed correctly and carry out any required
customisation (compensation curve, power, temperatures, etc.).

4.3 Maintenance
IMPORTANT

B

ALL MAINTENANCE WORK AND REPLACEMENTS MUST BE CARRIED
OUT BY SKILLED QUALIFIED PERSONNEL.
Before carrying out any operation inside the boiler, disconnect the power
and close the gas cock upstream. Otherwise there may be a danger of ex-
plosion, electric shock, suffocation or poisoning.

Periodical inspection

To ensure proper operation of the unit over time, have qualified personnel carry out a
yearly inspection, providing for the following checks:

The control and safety devices (gas valve, flow switch, thermostats, etc.) must func-
tion correctly.

The fume exhaust circuit must be perfectly efficient.
(Sealed chamber boiler: fan, pressure switch, etc. - The sealed chamber must be
tight: seals, cable glands, etc.)
(Open chamber boiler: anti-backflow device, fume thermostat, etc.)

The air/fume terminal and ducts must be free of obstructions and leaks

The burner and exchanger must be clean and free of deposits. Do not use chemical
products or wire brushes to clean.

The electrode must be properly positioned and free of deposits.

fig. 14 - Electrode positioning

The gas and water systems must be tight.

The pressure of the water in the system when cold must be approx. 1 bar; otherwise,
bring it to that value.

The circulating pump must not be blocked.

The expansion tank must be filled.

The gas flow and pressure must match that given in the respective tables.

P21

Solar standby time (b02=1)

0-20 seconds

10

Solar standby time (b02=2)

0-20 seconds

No effect on adjustment (b02=3)

--

No effect on adjustment (b02=4)

--

Contents

Description

Range

t01

NTC Heating sensor (°C)

between 05 and 125°C

t02

NTC Safety sensor (°C)

between 05 and 125°C

t03

NTC DHW sensor (°C)

between 05 and 125°C

t04

NTC External sensor (°C)

between -30 and 70°C (negative values flash)Without 
NTC = --

L05

Actual burner power (%)

00%=Min., 100%=Max.

F06

Actual Flame resistance (kOhm)

00-99 kOhm (-- = burner off)

St07

NOT AVAILABLE FOR THIS MODEL

F08

Actual DHW drawing (L min/10)

L min/10 over 99 flashing 3 figures

PP09

Actual modulating pump speed (%)

00-100% not working in this model

Contents Description

Range

FL D C

±

 0,5

=

=

Содержание 0DAC4ZYD

Страница 1: ...C24 32 c od 3541P520 Rev 00 06 2018 INSTRUCTIONS FOR USE INSTALLATION AND MAINTENANCE RU 1 3541P520...

Страница 2: ...tion 17 Water gauge Indication during operation Heating A heating demand generated by the Room Thermostat or Remote Timer Control is in dicated by flashing of the hot air above the radiator on the dis...

Страница 3: ...1 fig 1 to adjust parallel curve offset according to the characteristic fig 7 Press the reset button detail 6 fig 1 again for 5 seconds to exit the Sliding Temper ature menu If the room temperature i...

Страница 4: ...lling a gas cock between the system and boiler Make sure all the gas con nections are tight 3 5 Electrical connections IMPORTANT B BEFORE CARRYING OUT ANY OPERATION THAT REQUIRES REMOVING THE CASING D...

Страница 5: ...1 or 2 units of the parameter q01 by pressing the DHW button after each change wait 10 seconds for the pressure to stabilise 9 When the pressure read on the pressure gauge is equal to the minimum nom...

Страница 6: ...b02 4 b06 Mains Voltage Frequency 0 50Hz 0 1 60Hz b07 Comfort burner on time b02 1 0 20 seconds 5 No effect on adjustment b02 2 No effect on adjustment b02 3 No effect on adjustment b02 4 b08 Gas valv...

Страница 7: ...s of the fuel circuit and water systems Check the efficiency of the flue and air fume ducts while the boiler is working Make sure the water is circulating properly between the boiler and the systems M...

Страница 8: ...if necessary A09 Gas valve fault Wiring disconnected Check the wiring Faulty gas valve Check the gas valve and replace it if necessary F10 Delivery sensor 1 fault Sensor damaged Check the wiring or re...

Страница 9: ...et 1 2 9 Cold water inlet 1 2 10 System delivery 3 4 11 System return 3 4 fig 15 Front view fig 16 Side view fig 17 Top view FL D C24 fig 18 Bottom view FL D C24 and C32 fig 19 Top view FL D C32 700 4...

Страница 10: ...0 12 0 Min gas pressure at burner G20 mbar 1 5 1 5 Max gas flow G20 m3 h 2 73 3 64 Min gas flow G20 m3 h 0 88 1 22 Burner nozzles G31 no x 11 x 0 79 15 x 0 79 Gas supply pressure G31 mbar 37 37 Max g...

Страница 11: ...LPG B NATURAL GAS Circulating pump head pressure losses FL D C32 A Boiler pressure losses 1 2 and 3 Circulating pump speed A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 35 30 25 20 15 10 5...

Страница 12: ...ating pump 42 DHW temperature sensor 44 Gas valve 72 Room thermostat optional 81 Ignition detection electrode 95 Diverter valve 114 Water pressure switch 126 Fume thermostat 136 Flowmeter 138 External...

Страница 13: ...7 18 20 G8 0037 B A B 0DQXIDFWXUHU 0DQXIDFWXUHU DGGUHVV Model RGH Qnw Hi PMS PMW Qn Hi tmax C D Pn 80 60 H2O Pn 50 30 12 Serial number DUFRGH 1 1 3URGXFWLRQ GDWH See the manual 80 IPX5D 23 5 7 0 8 3 2...

Страница 14: ...1 1 2 3 4 5 6 7 8 9 10 11 12 Eco 13 14 15 16 17 11 1 d2 11 1 d1 Comfort 11 1 cap 4 4 11 1 d3 d4 d5 2 3 5 7 1 5 2 7 1 5 3 B sez 3 3 2 4 6 1 2 10 1 6 1 2 3 4 1 30 C 80 C 45 C 4 0 1 4 2 3 reset eco comf...

Страница 15: ...3 1 6 1 5 CU 1 1 1 10 6 0 3 1 OF 1 1 7 6 1 5 6 7 A 1 1 2 8 1 0 F37 1 8 300 Fh 0 8 8 1 9 9 I I I I I I I I I 20 30 40 50 60 70 80 90 85 20 10 0 10 20 1 2 3 4 5 6 8 9 10 7 20 30 40 50 60 70 80 90 85 20...

Страница 16: ...D C 16 RU cod 3541P520 Rev 00 06 2018 3 3 1 3 2 B 5 C 15 C A 3 3 B B 18 25 Fr 1 F 10 CaCO3 3 4 18 3 5 B B 3 3A B HAR H05 VV F 3x0 75 2 8 B 230 23 10 3 6 0 5 B 4 B LAMBORGHINI 1 2 3 4 5 6 72 139 138 3...

Страница 17: ...0 15 Eco comfort 5 B TEST Eco Comfort 2 q02 q02 1 2 10 3 1 q01 q01 1 2 10 Eco Comfort 2 TEST TEST TEST 3 4 1 5 TEST 13 13 TEST 100 3 4 1 00 100 1 1 0 2 1 100 TEST TEST 3 TEST 3 4 1 5 TEST 15 TEST sez...

Страница 18: ...10 b02 2 10 100 10 15 b02 3 b02 4 b12 0 1 0 FL D C P01 0 40 20 P02 1 20 C 5 P03 0 10 2 P04 0 20 6 P05 31 85 C 80 P06 0 100 100 P07 b02 1 0 1 2 3 4 b02 2 0 0 1 2 3 4 b02 3 0 1 2 3 4 C b02 4 0 1 2 3 4 C...

Страница 19: ...set 20 20 rE History 3 Eco comfort History Service Service Re set 20 20 4 2 B cap 5 4 3 B 14 1 P19 b02 1 0 20 C 10 b02 2 0 20 C b02 3 b02 4 P20 b02 1 0 20 C 10 b02 2 0 20 C b02 3 b02 4 P21 b02 1 0 20...

Страница 20: ...2 5 5 1 3 20 21 22 A01 A02 A03 F04 20 F05 A06 F07 A09 F10 1 F11 F14 2 A16 F20 A21 A23 A24 F34 170 F35 F37 F39 A41 o o a e o c o o e c a oc a e a o c c e e o e F42 F43 H 2O F50 8 1 2 56 9 1 2 74 10 3...

Страница 21: ...cod 3541P520 Rev 00 06 2018 7 3 4 8 1 2 9 1 2 10 3 4 11 3 4 15 16 17 FL D C24 18 FL D C24 e C32 19 FL D C32 700 400 mm 131 C24 mm 143 C32 0 1 2 3 4 330 208 216 184 36 66 66 66 66 100 155 10 8 7 9 11...

Страница 22: ...P 23 5 31 3 7 0 9 7 Pmax 80 60 C 91 0 91 0 30 89 6 89 8 NOx 3 150 mg kWh NOx G20 x 11 x 1 35 15 x 1 35 G20 20 0 20 0 G20 12 0 12 0 G20 1 5 1 5 G20 3 2 73 3 64 G20 3 0 88 1 22 G31 x 11 x 0 79 15 x 0 79...

Страница 23: ...11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 35 30 25 20 15 10 5 kW mbar B 0 1 2 3 4 5 6 7 0 500 1 000 1 500 2 000 Q l h H m H 2 O A 3 2 1 kW 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 2...

Страница 24: ...cod 3541P520 Rev 00 06 2018 5 6 23 A 32 42 44 72 81 95 114 126 136 138 139 278 81 1kW L N 230V 50 Hz 32 L N T T 278 T 42 4 3 2 1 44 136 ABM01A 95 3 2 1 RED LIGHT BLUE WHITE G N D O U T 5 V 114 126 3 2...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...i VIA n 047 6 BRUCIATORI CALDAIE MURALI E TERRA A GAS GRUPPI TERMICI IN GHISA E IN ACCIAIO GENERATORI DI ARIA CALDA TRATTAMENTO ACQUA CONDIZIONAMENTO...

Отзывы: