Step 7.1
Working from the temporary
platform, install two 4 rung frames
onto the 8 rung frames. Then, clip
onto the top rungs 2 diagonal braces.
The other end connects to the
rung 6 below on the opposite face.
Diagonal braces always run parallel
to the diagonal braces below. Now
install another 4 guard rails above
the 4 already in place for when the
platform is relocated, as shown.
Step 7.2
Remove the lower 4 guardrails
by either using the 3T method or
uninstalling them from the ground.
Then relocate the platform to the
top rung of the first frames. Working
off this new platform position, install
two 6 rung frames. Then clip on 2
more diagonal braces as previously
done. Ensure the trap platform is to
one side of the tower as shown and
the trap lid opens outwards.
Step 7.3
Lower the bottom platform down
2 rungs and relocate the guardrails
into the correct positions using the
3T method. Install another platform
8 rungs above and install 4 guardrails
using the 3T method. If a 3.7m tower
is being assembled, go to step 10.
Proceed to Step 8
Build Method D
3.7m, 5.7m, 7.7m, 9.7m, 11.7m