ALTO MD 250 Double Width Tower
| Assembly Guide
7
Step 7.1
Working from the temporary
platform, install two 8 rung frames
onto the first set of 8 rung frames.
Then, clip 2 diagonal braces on. The
lower hook of the braces should be
on the 6th rung up (the intermediate
guardrail level) and the upper hook
connects to the 4th rung of the new
frame - running in the same parallel
direction as the diagonal brace
below.
Step 7.2
Install a 2nd platform 8 rungs above
the first platform. Using the 3T
method install 4 guardrails to the
upper platform. Ensure the trap
platform is to one side of the tower
as shown and the trap lid opens
outwards. If a 3.2m high tower is
being assembled, go to step 10.
Proceed to Step 8
Build Method C
3.2m, 5.2m, 7.2m, 9.2m, 11.2m