background image

7

6.  Place the outer cover over the    
  6 vertical poles, making sure    
  to have the zip of the cover open 
  so that you can easily find the    
  holes in the bottom of the outer  
  cover. The large hole (with a black  
  frame) needs to be at the front.  
  (Diagram 6)

7.  Once you have the outer cover over  
  these 6 vertical poles place it on the  
  floor, so that you can see the vertical  
  poles. (Diagram 7)

8.  With two more folding joint arms  
  open and the flat edge up, attached  
  these to the 6 vertical poles, tighten  
  in place by turning the connector  
  screw clockwise. 
9.  Then join these folding joint arms  
  together across the middle with 3  
  shorter horizontal poles, tighten in
   place by turning the connector   
  screw clockwise.
10. Place 6 longer vertical poles into  
  the connectors facing upwards,  
  tighten in place by turning the   
  connector screw clockwise.
11.  Now we with two more folding    

 

  joint arms open and the flat edge  

 

  up, create the top of the Heated  

 

  Cabinet, attached these to the 6 
  vertical poles, tighten in place by 

 

  turning the connector screw clockwise.
12. Then join these folding joint arms
   together across the top with 
  the last 3 shorter horizontal poles,  

 

  tighten in place by turning the
   connector screw clockwise.  

 

 

  (Diagram 8)

8

7

6

Содержание DRY SOON 53343

Страница 1: ...Model 53343 HEATED CABINET INSTRUCTION BOOKLET ...

Страница 2: ...othes to be kept straight ironing time is reduced too Here at Lakeland our award winning family owned business still offers the same excellent quality value for money and exceptional customer service as when we founded the company back in the 1960s Our products are hand picked and thoroughly tested so you can be sure that everything you purchase will be a pleasure to use for many years to come CON...

Страница 3: ...3 6 5 8 7 10 9 1 Outer cover 2 Horizontal pole x9 66cm long 3 Folding joint arm x6 4 Vertical pole x12 71cm long 5 Heater vent 6 Feet x4 7 Heater rack 8 On off button 9 Heater control panel 10 Heater unit 11 Power cable 12 Remote control ...

Страница 4: ...e all packaging materials and any promotional labels or stickers are removed from the appliance before the first use Always inspect the appliance before use for noticeable signs of damage Do not use if damaged or has been dropped In the event of damage or if the appliance develops a fault contact the Lakeland customer care team on 015394 88100 Always use the appliance on a dry level heat resistant...

Страница 5: ...abinet after use leaving it to cool down completely before storing it away The appliance must be placed on a level dry surface at least 0 5 metres away from heat or water sources Ensure the appliance is folded out securely before loading it with laundry and switching it on When opening and closing the Heated Cabinet never use force The mechanisms should move freely and easily Keep fingers away fro...

Страница 6: ...tighten in place by turning the connector screw clockwise Diagram 3 4 Now you can construct the base together using 3 of the shorter horizontal poles 66cm Insert into the folding joint arm as per the image When pushed in securely tighten in place by turning the connector screw clockwise Creating the base rack of the Heated Cabinet Diagram 4 5 Select 6 of the longer vertical poles 71cm and now gent...

Страница 7: ...ning the connector screw clockwise 9 Then join these folding joint arms together across the middle with 3 shorter horizontal poles tighten in place by turning the connector screw clockwise 10 Place 6 longer vertical poles into the connectors facing upwards tighten in place by turning the connector screw clockwise 11 Now we with two more folding joint arms open and the flat edge up create the top o...

Страница 8: ... goes under the outer cover Diagram 9 15 Place the heater unit on to this rack and it will slot in place carefully slot the top of the heater unit through the hole at the bottom of the outer cover Diagram 10 16 Your Heated Cabinet is now ready to use Diagram 11 PLEASE NOTE Keep your face away from the ends of the poles when constructing 11 9 10 ...

Страница 9: ...eplaced by an adult Never dispose of batteries in fire as this may cause them to explode or attempt to disassemble the batteries Do not mix old and new batteries replace all batteries at the same time Do not mix Alkaline standard Carbon Zinc or rechargeable batteries Only batteries of the same or equivalent type as recommended are to be used Do not charge non rechargeable batteries Always remove e...

Страница 10: ...s and hook them onto the clothes rack spacing them out evenly for best results Load evenly across the clothes rack to avoid the Heated Cabinet tipping over Do not exceed the maximum load for the Heated Cabinet of 10kg WARNING Do not touch or cover the heater unit with clothes at any point PLEASE NOTE Clothes will take much longer to dry if the cover is not fully zipped 4 Plug in and switch on the ...

Страница 11: ...re storing USING THE HEATER UNIT WITH THE REMOTE CONTROL 1 When you plug in the heater unit and switch on at the mains socket the display with show 000 and bleep 2 Using the remote control point it at the heater you can increase or decrease the time on the heater unit by using Time and Time buttons up and down arrows on the remote control 3 The time will increase or decrease in 15 minute intervals...

Страница 12: ...The clothes may be too heavy or thick not spin dried or well wrung May sure that the outer cover is closed properly Question Why has my Heated Cabinet stopped suddenly Answer The set drying time may have elapsed The fan may be blocked activating the safety cut out Switch off and unplug the Heated Cabinet and let it cool down completely before clearing any blockages from fan vents and air intake ho...

Страница 13: ...e folding joint arms to move up in the middle Then carefully bring together the front and back corner upright poles so they touch the middle upright pole Close the zip and store PLEASE NOTE Keep your fingers away from the folding joint arms 3 To take apart the Heated Cabinet simply follow the steps in Setting up your Heated Cabinet for the first time in reverse 4 Check the fan vents and the air in...

Страница 14: ...cy 50Hz Approximate size Fully open 71 5 x 45 x 152cm H 28 x 17 x 59 Weight of product 4 6kg ELECTRICAL CONNECTIONS THIS APPLIANCE MUST BE EARTHED The appliance is fitted with a fused three pin plug to BS1363 which is suitable for use in all homes fitted with sockets to current specifications CHANGING THE 10 AMP FUSE Use a 10 amp BS1362 fuse Only BSI or ASTA approved fuses should be used If you ar...

Страница 15: ...15 ...

Страница 16: ...Lakeland Alexandra Buildings Windermere Cumbria UK LA23 1BQ Tel 44 0 15394 88100 www lakeland co uk 53343_211021_v1 ...

Отзывы: