Command Pro Engineered Systems
User Manual
18
142134
1.
Disconnect the ‘hot’ input wire X1 from the pendant and connect it to the (X1) terminal 11 of
connector TB1 on the receiver board (A).
2.
If you also need 21R14A receiver installation pendant control, connect a wire from the top right lug
on the RADIO/PENDANT transfer switch to the X1 input for the pendant (B).
3.
Install a wire (16 gauge) from the ‘X2’ terminal 12 (X2) of connector TB1 to the ‘neutral’ wire from
the Crane Control Power source (C).
4.
Install a wire (16 gauge) from the ‘MLC’ terminal 1 (MLC) of connector TB1 to the main line contactor.
This wire will provide a continuous voltage to the ML Coil when the radio is on (D).
Review the steps above to ensure the accuracy of the wiring before applying power to the installation.
Perform
21R14A Installation Testing
.
Содержание Command Pro SAFE-T-RANGE
Страница 19: ...Command Pro Engineered Systems User Manual 19 142134 Figure 6 21R14A Receiver ...
Страница 20: ...Command Pro Engineered Systems User Manual 20 142134 Figure 7 Typical 21R14A Power Control Wiring ...
Страница 23: ...Command Pro Engineered Systems User Manual 23 142134 Figure 9 Typical 21R22 Power Control Wiring ...
Страница 31: ...Command Pro Engineered Systems User Manual 31 142134 Figure 16 22R08A Series Receiver Relay Output Connections ...