
www.laing.de
9
www.laing.de
Installation and operation manual BM mini
!!!
Possible filling option, albeit a little complicated. One fill valve on the primary
return side allows for filling and air purging. The integrated ball valve must be
closed (horizontal).
Caution
: The floor heating flow at the BM mini must be
closed during the fill operation. Filling a wall heating loop is impossible in this
way.
Picture 5