Installation and operation manual BM mini
www.laing.de
www.laing.de
www.laing.de
!!!
Good filling option. Two existing fill valves on the primary side allow for good
filling and air purging. The ball valve position must be closed (horizontal).
!!!
Possible filling option, albeit a little complicated. One fill valve on the primary
flow side allows for filling and air purging. The integrated ball valve must be
closed (horizontal).
Caution
: The floor heating return at the BM mini must be
closed during the fill operation. Filling a wall heating loop is impossible in this
way.
Picture 3
Picture 4