background image

 

 

 

 

 

19 

 

16. INSTALLATION OF ROOF WINDOW MIDDLE DETAIL 

 

Attach grooved middle detail (DET-04) under roof window. Fasten with two screws at each end. 
Mark and drill holes in advance with a 4 mm drill. 
 

NB!

 

To make it easier to install the middle detail, we recommend attaching it to the rafters 

with a clamping screws. 

 

 

'(7

[[

[[

Содержание Greenhouse Mini

Страница 1: ...GREENHOUSE INSTALLATION MANUAL Greenhouse Mini www lahehouse com...

Страница 2: ...ing the greenhouse packaging the presence of parts and possible defects must be checked immediately Missing details and defects must be reported before installing the greenhouse Otherwise the greenhou...

Страница 3: ...90 degrees Only a proper level and load bearing foundation ensures an impeccable result A failed foundation makes it difficult to install details causes problems with the operation of doors and windo...

Страница 4: ...ol will be connected during installation During sorting you get full confidence that all the necessary details are present and without defects List of details 1 Back wall upper triangle ELM 04 1 pc 2...

Страница 5: ...5 Detail views 0 0 0 0 0 0 0 0 0 0 0 0 7 7 0 0...

Страница 6: ...4 GLASS 1 Endwall glass OKM 01 4 pcs 5 Roof glass KKM 02 7 pcs 2 Endwall glass OKM 02 4 pcs 6 Roof glass KKM 03 1 pcs 3 Endwall glass OKM 03 1 pc 7 Roof window glass KL 01 1 pc 4 Side glass KKM 01 8 p...

Страница 7: ...Quantity 60 pcs 5 Wood screw hidden head 5x40 drill bit TX25 Quantity 4 pcs 6 Glass screw 6 3x30 drill bit HEX4 pvc washer Quantity 103 pcs 103 pcs 7 M6 x 55mm bolt nut washer Quantity 6 pcs 6 pcs 12...

Страница 8: ...2 and the front wall base frame ELM 03 in a suitable position on the foundation or substrate Fasten the base frame together with a 5x80 mm wood screws NB After installation of base frame make sure tha...

Страница 9: ...Do not mix front and back wall details Choose a flat and clean work surface that offers neccessary suport for correct assembling All screws are already attached Follow markings and place details to co...

Страница 10: ...10 8 INSTALLATION OF BACK AND FRONT WALL Assemble back and front wall upper triangles and end wall posts Holes drilled in advance Screws partially placed in holes Tighten to the end 0 0 0 0 0 0...

Страница 11: ...11 Place back and front wall to the base frame ends and attach with screws Use two longer wooden bars as a support and fasten them with a clamping screw NB Use transportation box top bars as supports...

Страница 12: ...E BEAM Attach ridge beam to the front and back wall metal brackets are already attached NB Ridge beam position determines the side of the roof windows Make sure the roof windows get to the desired sid...

Страница 13: ...L INNER POSTS Place back wall inner posts to intended location and fix with screws Holes drilled in advance Screws partially placed in holes Tighten to the end NB Make sure distances between posts are...

Страница 14: ...vance Screws partially placed in holes Tighten to the end Make sure distances between posts are equal from top and bottom Doorpost with hinges must be at right side NB Make sure that the width of the...

Страница 15: ...with an M6 bolt wascher and nut Start installation of rafters from front wall and move toward back wall NB Make sure that the edge of the carrier does not cover rafter glass groove distance ca 2 mm an...

Страница 16: ...between two rafters so that it is fixed Make sure that edge of the rafter middle detail is parallel with rafter glass groove and do not block groove Rafter middle detail screw hole must be toward out...

Страница 17: ...use to the foundation through the base frame ELM 01 Drill hole in advance to the center of the gap between rafters Fasten the ends of the greenhouse through the base frame ELM 02 and ELM 03 Drill hole...

Страница 18: ...zed by the higher rain cover on ridge beam Place the roof window on the rafters and fasten it to the ridge beam Hinges are pre attached to the roof window frame NB To make it easier to install the roo...

Страница 19: ...ach grooved middle detail DET 04 under roof window Fasten with two screws at each end Mark and drill holes in advance with a 4 mm drill NB To make it easier to install the middle detail we recommend a...

Страница 20: ...the door ELM 11 to the hinges Install the door stops to the outside so that glass will be not dameged when the door is opened NB WITHOUT THE DOOR STOPS THERE IS DANGER TO FRONT WALL GLASS After the i...

Страница 21: ...and front wall glass Glass is fixed with a screws Pvc washer must be between the glass and the screw head NB It is recommended to have at least two persons for glass installation and always use suctio...

Страница 22: ...ce glass must move smoothly NB Line glasses by lower edge Make sure that the glass is evenly grooved and drill a hole to the middle detail DET 01 roof window lower frame with a depth of 30 mm Wood dri...

Страница 23: ...s are completely level If necessary adjust the greenhouse frame NB All rafter posts must be level before installation of side glass NB It is recommended to have at least two persons for glass installa...

Страница 24: ...r tighten screws NB Start installation of side glass from second glass This gives a better understanding that two glasses must be attached to one post and that their edges must extend evenly to the po...

Страница 25: ...are completely level If necessary adjust the greenhouse frame NB All posts must be level before installation of back wall glass NB It is recommended to have at least two persons for glass installatio...

Страница 26: ...rom top OKM 01 It is easier to align these smaller glasses according to drawing and these will be starting point for installing other glasses NB Make sure that the glasses are evenly spaced and that t...

Страница 27: ...ommended to have at least two persons for glass installation and always use suction cups to lift glass safely Installation of front wall glass will follow same logic as with back wall glass NB Make su...

Страница 28: ...racks 20 INSTALLATION OF ROOF GLASS SEAL OPTIONAL The greenhouse comes with roof glass seals 7 pcs which you can install if you need it When installing a greenhouse there is a small gap between the Ri...

Страница 29: ...TALLATION OF THRESHOLD COVER OPTIONAL Threshold cover will protect wooden threshold from damage and dirt Place stainless steel threshold cover to wooden threshold and attach with screws Drill holes in...

Отзывы: