17
PXl16 Sheartec:II Planer \ Setup Placement & Unboxing
5. Locate it close to a power source and dust collection.
6. Allow an area for the storage of blanks, finished products and tools.
Unboxing
WARNING!
·
THE MACHINE WEIGHS 597 LBS (270KG). ENSURE THAT YOU HAVE ENOUGH PEOPLE TO DO THE JOB SAFELY.
·
IF YOU HAVE ANY DOUBT ABOUT THE DESCRIBED PROCEDURE, SEEK PROFESSIONAL ASSISTANCE. DO NOT
ATTEMPT ANY PROCEDURE THAT YOU FEEL IS UNSAFE, OR THAT YOU DO NOT HAVE THE PHYSICAL CAPABILITY OF
ACHIEVING.
This step requires a forklift. The PX16 is heavy, be careful when lifting and handling it! Failure to comply
may cause serious injury and/or damage to the machine and/or property! Use a forklift to remove PX16
from pallet and place on floor.
NOTE: Another option to remove the planer from the pallet is to attach the included hooks to frame of
machine at each of the four corners (Fig. 1). The hooks and bolts are included in the hardware kit. The
machine can then be lifted with a harness and forklift. Remove and save hooks for later movement
scenarios.
FIGURE 1: LIFTING PLANER WITH HOOKS AND HARNESS
FIGURE 2: PALLET
Содержание Sheartec:II PXl16
Страница 1: ...PXl16 Sheartec II Planer Owner s Manual MPLANPX16 0130 3 10 2021...
Страница 24: ...24 PXl16 Sheartec II Planer Setup Assembling FIGURES 10 12 DRO ADJUSTMENT...
Страница 36: ...36 PXl16 Sheartec II Planer Wiring Wiring WARNING REVIEW ELECTRICAL SAFETY PRIOR TO ANY WIRING PROCEDURES 9...
Страница 37: ...37 PXl16 Sheartec II Planer Replacement Parts Diagram Replacement Parts Diagram Cutterhead Drivetrain...
Страница 38: ...38 PXl16 Sheartec II Planer Replacement Parts Diagram Table Lift...
Страница 39: ...39 PXl16 Sheartec II Planer Replacement Parts Diagram Stand Motor...
Страница 47: ...47 PXl16 Sheartec II Planer Warranty...