Operation
37
Operation
CAUTION!
PLACE THE PLANER ON A “
SECURE AND STABLE SURFACE”
FOR OPERATION.
“CLAMP OR
BOLT”
THE PLANER INTO POSITION.
1.) Establish the proper depth of cut (Equal to or less than 1/16”), using either the
DRO (Digital Read Out)
or
Scale
.
2.) Pull out and lock each extension roller to support long stock.
3.) Start Dust Collection Machine.
4.) Start Planer.
C displays the On/Off Switch
5.) Adjust & Set Feed Rate Speed (See Fig. C Below) to desired Speed (10 or 30 FPM), while planer is running.
WARNING!
THIS ACTION WILL VOID WARRANTY! IF OPERATOR DOES NOT ADJUST DESIRED SPEED
WHILE PLANER IS RUNNING.
6.) Feed stock into planer, maintain control and support of stock until the stock is securely feeding through planer.
7.) Reposition yourself to the outfeed side of planer and control and support stock until it has exited the outfeed
roller.
Helpful Tips:
•
PLANERS WORK BEST IF ONE FACE OF STOCK IS FLAT. IF NOT, FLATTEN WITH A JOINTER OR DRUM
SANDER.
• IF NOT POSSIBLE TO FLATTEN ONE FACE, PROCESS CUPPED MATERIAL WITH THE CUP “UP” SO THE
MATERIAL IS STABLE ON THE PLANER BED.
• IF MATERIAL IS SEVERELY CUPPED, ANOTHER OPTION IS TO RIP THE MATERIAL, PLANE IT AND GLUE IT
Содержание SHEARTEC II PX-22
Страница 2: ......
Страница 6: ...PX 22 SHEARTEC II PLANER 6 Laguna Tools 2022 ...
Страница 9: ...General Information 9 ...
Страница 10: ...PX 22 SHEARTEC II PLANER 10 ...
Страница 11: ...General Information 11 ...
Страница 12: ...PX 22 SHEARTEC II PLANER 12 ...
Страница 21: ...General Information 21 ...
Страница 23: ...General Information 23 Specifications ...
Страница 27: ...General Information 27 lifted with a harness and forklift Remove and save hooks for later movement scenarios ...
Страница 34: ...PX 22 SHEARTEC II PLANER 34 ...
Страница 36: ...PX 22 SHEARTEC II PLANER 36 ...
Страница 42: ...PX 22 SHEARTEC II PLANER 42 Front Rear Precision Adjustment ...
Страница 43: ...Maintenance 43 ...
Страница 44: ...PX 22 SHEARTEC II PLANER 44 ...
Страница 45: ...Maintenance 45 ...
Страница 46: ...PX 22 SHEARTEC II PLANER 46 ...
Страница 47: ...Maintenance 47 ...
Страница 48: ...PX 22 SHEARTEC II PLANER 48 ...
Страница 49: ...Maintenance 49 ...
Страница 50: ...PX 22 SHEARTEC II PLANER 50 ...
Страница 51: ...Maintenance 51 ...
Страница 52: ...PX 22 SHEARTEC II PLANER 52 ...
Страница 53: ...Maintenance 53 ...
Страница 54: ...PX 22 SHEARTEC II PLANER 54 ...
Страница 56: ...PX 22 SHEARTEC II PLANER 56 Lubrication Regular monitoring and replacement of lubrication is needed ...
Страница 57: ...Maintenance 57 ...
Страница 58: ...PX 22 SHEARTEC II PLANER 58 ...
Страница 63: ...Maintenance 63 Troubleshooting ...
Страница 64: ...PX 22 SHEARTEC II PLANER 64 Wiring WARNING REVIEW ELECTRICAL SAFETY Pg s 6 16 PRIOR TO ANY WIRING PROCEDURES ...
Страница 65: ...Wiring 65 ...
Страница 66: ...PX 22 SHEARTEC II PLANER 66 ...
Страница 67: ...Replacement 67 Replacement ...
Страница 68: ...PX 22 SHEARTEC II PLANER 68 ...
Страница 69: ...Replacement 69 ...
Страница 70: ...PX 22 SHEARTEC II PLANER 70 Replacement Parts Table ...
Страница 71: ...Replacement 71 ...
Страница 72: ...PX 22 SHEARTEC II PLANER 72 ...
Страница 73: ...Replacement 73 ...
Страница 74: ...PX 22 SHEARTEC II PLANER 74 ...
Страница 75: ...Replacement 75 ...
Страница 76: ...PX 22 SHEARTEC II PLANER 76 ...
Страница 77: ...Replacement 77 ...
Страница 78: ...PX 22 SHEARTEC II PLANER 78 ...
Страница 79: ...Replacement 79 ...
Страница 81: ...Dealer Machinery Warranty 81 ...