background image

Dake Corporation 

1809 Industrial Park Dr. 

Grand Haven, MI 49417 

www.dakecorp.com

 

 

974315 

  21 

REV112019 

 

PARTS LIST 

 

Item 

Part Name 

Part No. 

Machine Bed 

303340 

Revolving Arm 

020A0002 

Revolving Arm Pin 

302835 

Revolving Arm Lock Bushing 

AFB80012 

Revolving Arm Locking Lever 

AGB80016 

Screw (M8-1.25 x 20mm) 

80521 

Counter-Vise 

050B0008 

Counter-Vise Short Jaw 

130B0019 

10 

Counter-Vise Long Jaw 

130B0018 

11 

Counter-Vise Fixing Pin 

AFB80023 

12 

Material Support 

303343 

13 

Material Support 

303343 

14 

Washer (M8 x 21mm O.D.) 

 

82100000 

15 

Screw (M10 x 30mm L) 

81505 

17 

Vise (cast iron) 

050B0009 

18 

Vise Jaw 

130B0015 

19 

Vise Jaw Washer 

AFB8B037 

20 

Screw (M12) 

81110133 

21 

Vise Jaw Washer 

AFB8B037 

22 

Screw (M12) 

81110133 

23 

Roll Pin, M8 5927 

81132081 

24 

Lever Bushing  

AFB80032 

25 

Quick Lock Vise Lever 

AGB80031 

26 

Bearing AX 3047 + CP 3047 

84500001 

27 

Quick Lock Vise Washer 

AFB80033 

28 

Vise Handwheel (Ø18mm) 

47100000 

29 

Elastic Pin (Ø5mm) 

82504189 

30 

Washer (M8 x 21mm O.D.)  

82100000 

31 

Screw (M8-1.25 x 20mm L) 

80521 

35 

Quick Lock Vise Screw 

D50B0100 

36 

Quick Lock Vise Spring 

AFB80035 

37 

Burr-free Transverse Plate 

302962 

38 

Burr-free Plate 

302962 

39 

Roll Pin, M8 5927 

81132081 

41 

Tank Cover Filter 

AFB80044 

42 

Screw (M6 x 12mm L, coarse) 

80625 

43 

Bar Stop Rod 

AFC10047 

46 

Bar Stop 

ANC10046 

49 

Tank Cover Gasket 

ANB80042 

50 

Ring SEEGER Ø42mm 

82610000 

51 

Complete Assembly 51, 52, 53 

ANB80041 

52 

Complete Assembly 51, 52, 53 

ANB80041 

Содержание DAKE SUPER CUT 315

Страница 1: ...I 49417 Phone 800 937 3253 www dakecorp com DAKE MANUAL COLD SAW SUPER CUT 315 INSTRUCTIONAL MANUAL Read and understand all instructions and responsibilities before operating Failure to follow safety...

Страница 2: ...G AND ANCHORING 8 ELECTRICAL CONNECTION 8 ASSEMBLING THE MACHINE 9 CHOOSING A BLADE 9 OPERATION 10 STARTING AND CUTTING 11 MAINTENANCE 12 ROUTINE MAINTENANCE 12 CHANGING THE BLADE 13 CUTTING ANGLE ADJ...

Страница 3: ...o the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth th...

Страница 4: ...stallation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid...

Страница 5: ...ved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item rec...

Страница 6: ...hase 3 Phase 1 Phase Weight 450 lbs Horsepower 1 6 2 35 HP Work Height 38 1 2 Speeds 3 Phase 22 44 RPM 1 Phase 44 RPM Height 59 Max blade diameter 12 1 2 Base 26 x 36 CUTTING CAPACITY 90 2 5 8 3 5 8 3...

Страница 7: ...ety Warnings This machine is intended to be operated by one person This person should be conscious of the machine movement not only for themselves but also for persons on the immediate area of the mac...

Страница 8: ...be stationary Always disconnect the machine from the power socket before changing the blade or carrying out any maintenance job even in the case of abnormal machine operation Do not operate this mach...

Страница 9: ...fuses and earthing in the event of motor overload protection is provided by thermal probe In the event of incorrect operation or of dangerous conditions the machine may be stopped immediately by press...

Страница 10: ...place Part 3 Attach and align the work support bracket on the left hand side of the saw base using the two bolts provided CHOOSING A BLADE The saw will come with a DAKE Saw Pitch Calculator to assist...

Страница 11: ...the machine it is recommended to start using it in intervals of a half hour This operation should be repeated two or three times after this the machine may be used continuously Do not use cutting blad...

Страница 12: ...ith vise lever 5 5 Grip the handle 6 of the head control arm and press the button checking that the blade is turning in the direction indicated if not invert the two phase leads and that sufficient co...

Страница 13: ...s on the return spring WEEKLY MAINTENANCE Sharpen blade Clean blade housing Make sure the gearbox is full of oil Check power chord for any damage Clean shavings from lubricant tank Clean and grease th...

Страница 14: ...eplace flange and screw the blade guard back in to place CUTTING ANGLE ADJUSTMENT Release the lever to rotate the cutting head and make sure that the desired cutting angle perfectly matches the refere...

Страница 15: ...ll blade Speak with blade provider and sharpener Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condition of the jaw faces Insufficient coola...

Страница 16: ...es on cutting surface Blade diameter incorrect and or too large Decrease blade diameter Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condit...

Страница 17: ...ing and the outgoing voltages which should be 24 volts Auxiliary Relay Check voltages to relay terminals should be 24 volts If not check for loose wires if none relay should be replaced Motor will not...

Страница 18: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 17 REV112019 ELECTRICAL COMPONENTS Single Phase...

Страница 19: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 18 REV112019 Three Phase...

Страница 20: ...n MI 49417 www dakecorp com 974315 19 REV112019 KEY 140 Auxiliary Relay 141 Remote control Switch 142 Fuse Carrier 143 Transformer 144 Socket Connector 145 Plug Connector 146 Speed Switch 147 Reset Bu...

Страница 21: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 20 REV112019 EXPLODED VIEW...

Страница 22: ...0015 19 Vise Jaw Washer AFB8B037 20 Screw M12 81110133 21 Vise Jaw Washer AFB8B037 22 Screw M12 81110133 23 Roll Pin M8 5927 81132081 24 Lever Bushing AFB80032 25 Quick Lock Vise Lever AGB80031 26 Bea...

Страница 23: ...71 Hex Nut M8 1 25 81573 72 Hex Nut M16 81600016 73 Head Lever 120C0004 74 Handgrip 44600001 75 Ring Nut M25 1 5 81700025 76 Worm Wheel ABB81005 77 Oil Seal 35x47x7mm 302849 78 Blade Shaft 060C0009 7...

Страница 24: ...Motor 3 Phase CE 74320127 Motor Single Phase CE 74320122 1 140 Auxiliary Relay 72300000 141 Remote Control Switch 301462 142 Fuse Holder 73142005 143 Transformer 30VA 73327011 144 Socket Connector 736...

Страница 25: ...ollowing 1 Unplug machine 2 Release the arch return spring 3 Empty coolant tank 4 Carefully clean and grease machine 5 If necessary cover the machine DISMANTLING THE MACHINE If this machine is permane...

Отзывы: