Laguna Tools DAKE SUPER CUT 315 Скачать руководство пользователя страница 17

Dake Corporation 

1809 Industrial Park Dr. 

Grand Haven, MI 49417 

www.dakecorp.com

 

 

974315 

  16 

REV112019 

 

SYMPTOM 

CAUSE 

SOLUTION 

Dirt on the gripping device 

Carefully clean the contact 

surfaces 

Control power indicator light 

does not work 

Bad fuses 

Check and/or change fuses 

Faulty power supply  

Check incoming power 

Short circuit 

Test for short and repair 

Bad light bulb 

Replace light bulb 

Speed switch is off 

Turn switch to desired speed 

Emergency switch is 

depressed 

Pull switch out and make sure 

contacts are operating  

Thermal overload tripped  

Wait 10-15 for motor to cool, 

check for continuity on the 

two thermal overload wires, if 

none, change motor or it have 

rewound 

Transformer 

Check the incoming and the 

outgoing voltages which 

should be 24 volts 

Auxiliary Relay 

Check voltages to relay 

terminals, should be 24 volts. 

If not check for loose wires, if 

none relay should be 

replaced 

Motor will not work bit the 

indicator light is on 

Socket and/or plug 

connecting the switch handle 

to the electrical box 

  

Check the plug connections 

and the wire connections 

inside the handle switch 

 

Switch inside the handle 

Make sure the switch makes 

the connection when pressed 

 

Main connection 

Make sure there is incoming 

power and outgoing when the 

handle switch is made, no 

shorts if so, change the 

connector  

 

Motor 

Check to see if it spins freely 

and it is not burnt, may need 

to be changed or rewound. 

Check to see if it is receiving 

voltage from the connector. 

*

All electrical troubleshooting should be done by a qualified electrician or a technician with a 

working knowledge for machine electrical systems. 
 
 

Содержание DAKE SUPER CUT 315

Страница 1: ...I 49417 Phone 800 937 3253 www dakecorp com DAKE MANUAL COLD SAW SUPER CUT 315 INSTRUCTIONAL MANUAL Read and understand all instructions and responsibilities before operating Failure to follow safety...

Страница 2: ...G AND ANCHORING 8 ELECTRICAL CONNECTION 8 ASSEMBLING THE MACHINE 9 CHOOSING A BLADE 9 OPERATION 10 STARTING AND CUTTING 11 MAINTENANCE 12 ROUTINE MAINTENANCE 12 CHANGING THE BLADE 13 CUTTING ANGLE ADJ...

Страница 3: ...o the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth th...

Страница 4: ...stallation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid...

Страница 5: ...ved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item rec...

Страница 6: ...hase 3 Phase 1 Phase Weight 450 lbs Horsepower 1 6 2 35 HP Work Height 38 1 2 Speeds 3 Phase 22 44 RPM 1 Phase 44 RPM Height 59 Max blade diameter 12 1 2 Base 26 x 36 CUTTING CAPACITY 90 2 5 8 3 5 8 3...

Страница 7: ...ety Warnings This machine is intended to be operated by one person This person should be conscious of the machine movement not only for themselves but also for persons on the immediate area of the mac...

Страница 8: ...be stationary Always disconnect the machine from the power socket before changing the blade or carrying out any maintenance job even in the case of abnormal machine operation Do not operate this mach...

Страница 9: ...fuses and earthing in the event of motor overload protection is provided by thermal probe In the event of incorrect operation or of dangerous conditions the machine may be stopped immediately by press...

Страница 10: ...place Part 3 Attach and align the work support bracket on the left hand side of the saw base using the two bolts provided CHOOSING A BLADE The saw will come with a DAKE Saw Pitch Calculator to assist...

Страница 11: ...the machine it is recommended to start using it in intervals of a half hour This operation should be repeated two or three times after this the machine may be used continuously Do not use cutting blad...

Страница 12: ...ith vise lever 5 5 Grip the handle 6 of the head control arm and press the button checking that the blade is turning in the direction indicated if not invert the two phase leads and that sufficient co...

Страница 13: ...s on the return spring WEEKLY MAINTENANCE Sharpen blade Clean blade housing Make sure the gearbox is full of oil Check power chord for any damage Clean shavings from lubricant tank Clean and grease th...

Страница 14: ...eplace flange and screw the blade guard back in to place CUTTING ANGLE ADJUSTMENT Release the lever to rotate the cutting head and make sure that the desired cutting angle perfectly matches the refere...

Страница 15: ...ll blade Speak with blade provider and sharpener Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condition of the jaw faces Insufficient coola...

Страница 16: ...es on cutting surface Blade diameter incorrect and or too large Decrease blade diameter Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condit...

Страница 17: ...ing and the outgoing voltages which should be 24 volts Auxiliary Relay Check voltages to relay terminals should be 24 volts If not check for loose wires if none relay should be replaced Motor will not...

Страница 18: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 17 REV112019 ELECTRICAL COMPONENTS Single Phase...

Страница 19: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 18 REV112019 Three Phase...

Страница 20: ...n MI 49417 www dakecorp com 974315 19 REV112019 KEY 140 Auxiliary Relay 141 Remote control Switch 142 Fuse Carrier 143 Transformer 144 Socket Connector 145 Plug Connector 146 Speed Switch 147 Reset Bu...

Страница 21: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 20 REV112019 EXPLODED VIEW...

Страница 22: ...0015 19 Vise Jaw Washer AFB8B037 20 Screw M12 81110133 21 Vise Jaw Washer AFB8B037 22 Screw M12 81110133 23 Roll Pin M8 5927 81132081 24 Lever Bushing AFB80032 25 Quick Lock Vise Lever AGB80031 26 Bea...

Страница 23: ...71 Hex Nut M8 1 25 81573 72 Hex Nut M16 81600016 73 Head Lever 120C0004 74 Handgrip 44600001 75 Ring Nut M25 1 5 81700025 76 Worm Wheel ABB81005 77 Oil Seal 35x47x7mm 302849 78 Blade Shaft 060C0009 7...

Страница 24: ...Motor 3 Phase CE 74320127 Motor Single Phase CE 74320122 1 140 Auxiliary Relay 72300000 141 Remote Control Switch 301462 142 Fuse Holder 73142005 143 Transformer 30VA 73327011 144 Socket Connector 736...

Страница 25: ...ollowing 1 Unplug machine 2 Release the arch return spring 3 Empty coolant tank 4 Carefully clean and grease machine 5 If necessary cover the machine DISMANTLING THE MACHINE If this machine is permane...

Отзывы: