Laguna Tools 972016-2 Скачать руководство пользователя страница 16

 

 

 Dake Corporation 

1809 Industrial Park Dr 

Grand Haven, MI 49417 

www.dakecorp.com 

 

Part# 972016-2 

 

16 

 REV#082020 

Cylinder Breakdown: 

 

 

Item #  

Part Name  

Part# 150 Ton  

QTY 

Piston Gasket 

 

Piston O-ring 

 

Head Guide Rings 

 

Head O-ring 

 

Head Gasket 

 

Head Scraper 

 

N/A 

Repair Kit 

 

 

Washer 

 

Hose Fitting Top 

302922 

8A 

Hose Fitting Bottom 

302922 

NOT SHOWN 

Gauge 

303360 

 

  

  

  

  

  

  

  

  

  

  

  

2   

3   

  

6   

7   

8   

Содержание 972016-2

Страница 1: ...Park Dr customerservice dakecorp com Grand Haven MI 49417 FORCE 150 Ton Press INSTRUCTION MANUAL 220V 440V WARNING Read and understand all instructions and responsibilities before operating Failure to...

Страница 2: ...turn Refund Policy 5 Returns 5 Refunds 5 Specifications 7 Product Features 7 Machine Specifications 7 Safety Labels 8 Machine Procedures 9 Loading and Unloading Machine 9 Filling Oil Pump Reservoir 9...

Страница 3: ...facility to be free from defects in material and workmanship under normal use and service within 90 days from the return date to the end user as it pertains to the repair work completed The standard...

Страница 4: ...fied professional and is not in accordance with applicable local codes ordinances and good trade practices b Defects or malfunctions resulting from improper installation or failure to operate or maint...

Страница 5: ...pproved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item...

Страница 6: ...operation safeguarding system The standard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of t...

Страница 7: ...teady quiet oil flow CE approved controls located in convenient locations are all low voltage with overload protection and low tension coils Joystick operation for easy machine operation Rapid advance...

Страница 8: ...nimum Ram to Table 14 Inches Voltage Available 220 Volt 3 Phase Available 440 Volt 3 phase Machines must be wired to main service by a qualified electrician AMP 9 7 amp Service for 220 Volt Machine 6...

Страница 9: ...for damage to the machine while loading or unloading the press Filling Oil Pump Reservoir Required Oil is DTE 24 Hydraulic Oil To fill the pumping unit use exclusively the oils indicated in the table...

Страница 10: ...on these machines are 9 7 amps on 220 Volt 3 phase and 5 6 amp on 440 Volt 3 phase For proper operation it is necessary to ensure constant voltage and it must not exceed or be lower than 5 of the rat...

Страница 11: ...When the unit emits a dull sound with no jumps and the sound of the pump is constant An uneven tinny noise indicates there is air in the pump The oil in the reservoir may fall on start up Therefore it...

Страница 12: ...e nose piece are fully tightened Procedure 1 Hook the chains Pos 5 to the respective eyebolts and lift the cylinder ram until the chains are set under tension but do not lift the table 2 Check the cha...

Страница 13: ...rectly Test the 4 way valve for proper function Question Machine will not build desired pressure Solution Relief valve needs to be reset Remove octane cap from back of manifold and adjust set screw to...

Страница 14: ...number QTY 1 Pump Start Button 716542 1 2 Stop Button 716539 1 3 Start Button 716556 1 4 Emergency Button 716538 1 5 Power Light 300298 1 6 Main Power Switch 302169 1 7 Elect Box Lock 300628 7A Door K...

Страница 15: ...2 15 REV 082020 Electrical Box Components Item Part Name 150 Ton QTY 1 Contactor 1 2 Transformer 1 3 Overload 220 volt 1 3 Overload 440 volt 1 3A N O Contact Block 1 4 Relay 1 5 Fuse Block 1 5B Fuse 2...

Страница 16: ...REV 082020 Cylinder Breakdown Item Part Name Part 150 Ton QTY 1 Piston Gasket 1 2 Piston O ring 1 3 Head Guide Rings 1 4 Head O ring 1 5 Head Gasket 1 6 Head Scraper 1 N A Repair Kit 7 Washer 2 8 Hos...

Страница 17: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com Part 972016 2 17 REV 082020 Electrical Diagram...

Страница 18: ...ts are available for direct purchase from Dake or through a distributor When placing a parts order you will need to provide the part number name of part and model number All parts shipped F O B Factor...

Отзывы: