HANDLING
99
10
HANDLING
The crane hook will be fitted with a gantry or a spreader system with
two slings.
The slings shall not be connected directly onto the hook, as it would
result in unusual compressive stresses on the hull.
- Crane lifting should be carried out slowly.
- Control the movement of the boat using mooring ropes.
n
10.3 Mast stepping - Mast unstepping
Mast stepping and mast unstepping shall be carried out by a specialist.
n
10.1 Preparation
The initial launching and the first tests of the different equipments
shall be carried out by your dealer so that you can expect to enjoy the
warranty in case of some equipment failure.
All further handling shall be carried out with the highest care by pro-
fessionals.
If the LAGOON boatyard are not involved in your handling operations,
they cannot cover under guarantee any possible accidents linked to
handling.
If later you have to launch your boat yourself, you should take the
following precautions:
- Retract the sensors under the hull into their housings (they may be
damaged by the handling slings).
- Check the water suction boxes for cleanliness.
- Turn off all the water inlet and drain valves (grey waters, black wa-
ters, engines).
- Check the anodes are in good condition and properly installed. An
anode shall never be painted.
n
10.2 Crane lifting
- Install a bow mooring rope, a stern mooring rope and fenders.
When using a crane to move the boat, check that slings cannot touch
any device (depth finder, speedometer, etc.) nor the propellers.
DANGER
Do not stay on board or under the boat during
craning.
Содержание 46
Страница 1: ...User s guide...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 16: ......
Страница 18: ...HULL PROTECTION 16 HULL DECK PROTECTIVE FENDERS...
Страница 28: ...26 HULL DECK TENDERLIFT TENDERLIFT HYDRAULIC PUMP TENDERLIFT FOLDING PANELS...
Страница 30: ......
Страница 31: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 29 3...
Страница 44: ......
Страница 46: ...SALOON LIGHTINGS 44 ACCOMMODATIONS REMOVABLE DRAWERS LIGHT SWITCHES electrical panel 1 2 3 4 5 6...
Страница 50: ......
Страница 60: ......
Страница 61: ...WATER SYSTEMS 6 1 Bilge pump system 6 2 Grey waters 6 3 Black waters 6 4 Fresh water 6 5 Watermaker 59 6...
Страница 72: ......
Страница 73: ...ELECTRICITY 7 1 12 V circuit 7 2 Inverter 7 3 Solar panels 7 4 110 V 220 V circuit 7 5 Electronics 71 7...
Страница 78: ...TOUCH SCREEN AUTOMATIC BREAKERS 76 ELECTRICITY TOUCH SCREEN CONSUMING APPLIANCES CIRCUIT BREAKERS...
Страница 86: ......
Страница 87: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Dash board 85 8...
Страница 90: ...FUEL 88 MOTORIZATION FUEL FILTER FUEL GAUGE TOUCH SCREEN FUEL VALVE FUEL TANK DECK FILLERS...
Страница 92: ...DASH BOARDS FOLDING PROPELLER ANODE 90 MOTORIZATION DASH BOARDS FOLDING PROPELLER ANODE...
Страница 94: ......
Страница 95: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 93 9...
Страница 96: ...94 WINTER STORAGE...
Страница 98: ......
Страница 99: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 97 10...
Страница 100: ...DIMENSIONS FOR CRANE LIFTING 98 HANDLING 2480 mm 8970 mm...
Страница 102: ......
Страница 104: ...102 SAFETY...
Страница 114: ......
Страница 115: ...MAINTENANCE 12 1 Maintenance schedule 113 12...
Страница 118: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......