background image

 

1) 

INTRODUCTION 

 
 
 
 
 

 

The Lab-Plant SD-06AG Laboratory Scale Spray Dryer  

is the result of more than 30  years of  continuous development. 

 
 

 

The SD-06AG has been designed primarily for simplicity and ease of use, 

rapid assembly and disassembly for cleaning, minimal maintenance, 

efficiency of operation and reproducibility of previous conditions. 

 
 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание SD-06AG

Страница 1: ...4 Components Included 5 Packing List 6 Connection to Electrical Supply 7 Assembly and Preparation 8 Controls 9 Jet Spray Assembly 10 Operation 11 General Advice and Useful Hints 12 Optional Accessori...

Страница 2: ...r is the result of more than 30 years of continuous development The SD 06AG has been designed primarily for simplicity and ease of use rapid assembly and disassembly for cleaning minimal maintenance e...

Страница 3: ...ble to expose any person to hazardous solids liquids dusts vapours gases or micro organisms You are also required to introduce suitable procedures for handling these substances and to keep appropriate...

Страница 4: ...r Residual Current Circuit Breaker RCCB to protect the operator from electric shock in the event of misuse or accident e Potential hazards should always be the first consideration when deciding on a s...

Страница 5: ...2023 PTFE Transition Piece 1 SDS2031 Silicone Tube 4 8mm bore x 1 6mm wall 2 0 m SDS2022 Exhaust Tube 1 7 m Nylon Tube 4mm fitted to unit 1 0 m Nylon Tube 6mm fitted to unit 1 0 m The above comprises...

Страница 6: ...he U shaped clamp on the left hand side of the unit slacken the two black knobs and slide the main chamber in towards the central control panel Lightly tighten the two black knobs with the 90 outlet o...

Страница 7: ...and the blue nylon tube into the push in fitting at the top of the assembly The silicone tube for the liquid sample is fitted to the grooved inlet The remaining tube is fitted through the pump and th...

Страница 8: ...on is used in the set De Blocker screen to change the De Blocker from Slow to Medium or Fast 7 The next button is active on all screens and is used to select the next screen 8 The Stop button is activ...

Страница 9: ...lowing procedure De blocker inlet A Sample Inlet B Atomising air inlet C Open the hinged plastic cover of the pump and leaving sufficient tube to connect to the jet when it is in the top chamber inser...

Страница 10: ...setting screen The information indicates pump speed on a nominal 50 scale For appropriate flow rates in ml hr please see the chart on Note II The compressed air pressure setting is factory set to a m...

Страница 11: ...ll times on the set temp screen A fixed over temperature protection cut out is fitted and will actuate at approximately 300 C if actuated allow to cool down and re start allow inlet temperature to sta...

Страница 12: ...llow the main chamber a few minutes to heat up The inlet temperature may show the required setting but the glassware and main chamber will be quite cool for a few minutes Wait until inlet temperature...

Страница 13: ...15 ml hour 45 RPM 1895 ml hour 40 RPM 1665 ml hour 35 RPM 1500 ml hour 30 RPM 1305 ml hour 25 RPM 1090 ml hour 20 RPM 900 ml hour 15 RPM 695 ml hour 10 RPM 485 ml hour 5 RPM 280 ml hour SD 06AG Drying...

Страница 14: ...ng 13A MAINTENANCE Regular maintenance of any equipment ensures maximum trouble free life Customers are recommended to carry our simple maintenance at regular intervals the most basic of which is to k...

Страница 15: ...800mm long SDS2024 Chimney Extension required when using SDS2020 SDS2022 Cyclone SDS2023 PTFE Connection Tube SDS 0021 Clamp for Chamber Cyclone to PTFE Connection Tube SDS2006 Sample Collection Bott...

Страница 16: ...l 41 41 541 5877 Fax 41 41 541 5878 Email General Information Sales info kesn ch Accounts Department accounts kesn ch USA O ce 233 Rogue River Highway 425 Grants Pass Oregon 97527 5429 USA Tel 1 503 2...

Отзывы: