background image

 

CONCRETE PULVERIZERS 

 

Maintenance

 

Section 5

 

Page 13

 

ATTACHMENT BUILD-UP AND 

HARDSURFACING 

(CONTINUED)

4.

 Apply a bead of Amalloy 814H rod or equivalent directly 

on top of each of the underlayment beads to create a 45º 
cross-hatch or “diamond” pattern on the approved sur-
faces of the attachment. Space the beads approximately 
1½ to 2" apart. It is important to use an air-operated slag 
peener on each pass of weld to relieve stress. 

5.

 Taper the ends of each hardsurface bead by grinding 

in line with the cutting edges. Do not undercut the weld 
with the grinder.

6. 

When welding and grinding is complete, peen the  

welded area until it is shiny or until the peener cannot 
dent the weld anymore  (typically 5 to 10 minutes).  This 
will harden the welded area.

7.

 When  fi nished, be sure to cover the reworked teeth 

area with a heat blanket to allow it to cool slowly. 

DETAIL A

(UPPER JAW SIMILAR)

DETAIL B

(UPPER JAW SIMILAR)

BLADE SEATS

(BOTH SIDES)

OUTER TINES

BASE PLATE

(BOTH SIDES)

FIGURE 4-8

Содержание CP 80

Страница 1: ...Safety Operation Maintenance Manual Concrete Pulverizers Part Number T039705...

Страница 2: ...o know the correct operating procedures of the attachment and all safety precautions to prevent the possibility of property damage and personal injury The LaBounty attachment has been designed and man...

Страница 3: ...eral Rules for Safe Operation 4 3 Attachment Controls 4 4 Getting the Feel of the Attachment 4 5 Feathering the Controls 4 5 Concrete Pulverizer Operating Tips 4 6 Section 5 Maintenance Maintenance Sa...

Страница 4: ......

Страница 5: ...Introduction to Safety Section 1 Page 1 CONCRETE PULVERIZERS SECTION 1 INTRODUCTION TO SAFETY Introduction 1 2 Understand Signal Words 1 2 Safety Summary 1 3 Attachment Decals 1 4...

Страница 6: ...d be sure that you understand all controls and operating instructions before attempting to operate this equipment Failure to follow the safety precautions can result in personal injury death or proper...

Страница 7: ...nd follow proper lockout tag and repair procedures Ensure that the cab is equipped with the proper safety guards for LaBounty applications In addition it is required that the cab be equipped with an a...

Страница 8: ...contact with the skin as it could cause severe burns Wear adequate protective clothing and safety equipment DO NOT tamper with any hydraulic line or component while it is pressurized Escaping fluid un...

Страница 9: ...Safety Section 1 Page 5 CONCRETE PULVERIZERS STANLEY LABOUNTY BRAND DECALS REPLACEMENT DECALSAVAILABLE UPON REQUEST FIGURE 1 1 SAFETY FIRST DECAL PART NUMBER 503590 INCLUDEDWITH MANUALS FIGURE 1 2 AT...

Страница 10: ...TINUED GREASE 1538 Highway 2 Two Harbors MN 55616 tel 1 800 522 5059 fax 218 834 3879 www stanleyhydraulic com Made in the U S A with Global Materials Attachment Model Serial Number Year of Manufactur...

Страница 11: ...CONCRETE PULVERIZERS About the Attachment Section 2 Page 1 SECTION 2 ABOUT THE ATTACHMENT Model Description 2 2 Features 2 2 Concrete PulverizerTerms 2 3 Concrete Pulverizer Glossary 2 4...

Страница 12: ...as hydraulic hammers and wrecking balls Concrete Pulverizers are available in sizes for base machines ranging from 25 000 to 160 000 pounds 11 500 to 73 000 kg and openings from approximately 28 to 54...

Страница 13: ...tachment Section 2 Page 3 ATTACHMENT TERMS FIGURE 1 5 BUCKET CYLINDER EXCAVATOR STICK MOUNTING PAD POSITIONARM GUIDE LINK LINK PIN POWER LINK UPPER JAW MOVEABLE MAIN PIVOT MAIN PIN LOWER JAW STATIONAR...

Страница 14: ...ibutes stresses evenly through the stick during operation Position Arm A structural member pinned between the lower jaw and mounting pad to support the lower jaw and hold it stationary Power Link Part...

Страница 15: ...CONCRETE PULVERIZERS Installation Section 3 Page 1 Concrete Pulverizer Mounting Instructions 2 2 Concrete Pulverizer Removal 2 5 Concrete Pulverizer Storage 2 5 SECTION 3 INSTALLATION...

Страница 16: ...xcavator into position and line up the excavator stick tip with the main pivot of the pulverizer as shown in figure 3 1 3 Install the main pin through the main pivot of the CP and the stick tip of the...

Страница 17: ...ucket cylinder to position the lower jaw as shown in figure 3 3 7 Place the mounting pad on the bottom of the excavator stick Connect the position arm to the lower jaw of the puliverizer Make sure the...

Страница 18: ...nd to taper in both the side view as shown in figure 3 5 and in the top view figure 306 Under no circumstances should the mounting pad be welded around the ends see figure 3 4 If the pulverizer is equ...

Страница 19: ...the pin from linkage connection 4 Remove the pin from the main pivot With all personnel standing clear carefully raise the excavator stick away from the puliverizer CONCRETE PULVERIZER STORAGE 1 Place...

Страница 20: ...CONCRETE PULVERIZERS Page 6 Section 3 Installation...

Страница 21: ...Page 1 SECTION 4 OPERATION BeforeYou Start 4 2 WhatYou ll Need 4 2 FirstThings First 4 3 General Rules for Safe Operation 4 3 Attachment Controls 4 4 Getting the Feel of the Attachment 4 5 Feathering...

Страница 22: ...ST THINGS FIRST 1 Ensure all safe viewing distance decals are installed and legible contact LaBounty for replacements as required 2 Have a DAILY Safety Dialog with all those with whom you work Inform...

Страница 23: ...eye on exposed parts such as the position arm so as to not damage them when working in confined spaces 9 ALWAYS maintain at least 15 feet 5 meters between the attachment and any nearby power lines or...

Страница 24: ...no additional hydraulics are required The bucket dump control opens the attachment and the bucket curl closes the attachment FIGURE 4 1 Determine the control for each movement of the attachment befor...

Страница 25: ...maintenance program to reduce the possibility of costly downtime FEATHERING THE CONTROLS The fluid nature of hydraulic power requires a special operating approach to the attachment that can be descri...

Страница 26: ...ore crushing begins see figure 4 3 FIGURE 4 3 2 When processing large heavy materials open and close with short cycles rather than attempt to crush the material in one cycle see figure 4 4 This allows...

Страница 27: ...jaw can be adjusted see figure 4 5 For each job the lower jaw can be positioned to make the CP more productive or easier to use Some experimentation may be necessary to learn the advantages of each po...

Страница 28: ......

Страница 29: ...Checklist 5 4 Concrete Pulverizer Lubrication 5 6 General Guidelines for Build up and Hardsurfacing 5 8 Build up Recommendations 5 9 Hardsurfacing Recommendations 5 9 Tooth Build up and Hardsurfacing...

Страница 30: ...ontact your LaBounty dealer For the nearest LaBounty dealer see the Contact Information at the front of this manual Inspect the attachment daily DO NOT operate a poorly maintained or damaged attachmen...

Страница 31: ...up or hardsurfacing is required Rotate or replace if necessary Refer to page 5 6 for instructions PERIODIC SERVICE SCHEDULE SERVICETHE ATTACHMENT AT SPECIFIED INTERVALS Inspect lubricate make service...

Страница 32: ...for damage or looseness _______ c If necessary rework or replace the teeth as outlined in this manual _______ 3 Inspect all bolts _______ a Visually inspect all bolts and replace any that are loose or...

Страница 33: ...re indicated on the illustration see figure 5 1 below and by yellow GREASE decals on the attachment Fill with grease until excess appears LOCATION ON ATTACHMENT NUMBER OF SHOTS 1 Link pin connection m...

Страница 34: ...under and set it down on a firm and level surface with the jaws open figure 5 2 Turn the base machine off Make sure that the attachment and jaws are stable and will not drop or close Block up if nece...

Страница 35: ...at Be sure to install the pin so the groove in the pin will line up with the retainer ring inside the tooth seat The retainer ring should seat in the pin groove 7 Repeat this process for the other wor...

Страница 36: ...elding has been completed Avoid cyclic heating and large temperature swings Preheating may be done by localized gas torches or thermal strip blankets POST HEAT If preheat has dropped below 400 F 200 C...

Страница 37: ...t is important to always use a hardsurfacing weld material with a chromium content of less than 10 and a severe impact resistance rating to prevent cracking If in doubt about what hardsurface material...

Страница 38: ...e stick to test the area frequently because overheating can harm the tooth Temperature sticks are available from LaBounty 4 Using AWS E7018 welding rod or equivalent make side by side passes down the...

Страница 39: ...s It is impor tant to use an air operated slag peener on each pass of weld to relieve stress 7 Taper the ends of each hardsurface bead by grinding in line with the cutting edges Do not undercut the we...

Страница 40: ...50 F 230 C Use a temperature stick to test the area frequently to avoid overheating and damaging the attachment Temperature sticks are available from Stanley LaBounty 3 Using AWS E7018 welding rod or...

Страница 41: ...er on each pass of weld to relieve stress 5 Taper the ends of each hardsurface bead by grinding in line with the cutting edges Do not undercut the weld with the grinder 6 When welding and grinding is...

Страница 42: ...ide below to determine the size of the bolt being installed 4 Use the Dry BoltTorque Chart below to find the proper torque When possible torque the nut rather than the bolt head METRIC CLASS 10 9 SIZE...

Страница 43: ...307988 Template 1 307989 Outer Template 1 307990 Inner Template 1 40 304884 Template 1 304885 Build up Template 1 304886 Build up Template 1 60 307569 Template 1 307570 Template 1 307571 Template 1 8...

Страница 44: ...Department 2 A factory issued Return Material Authorization tag RMA must accompany returned product 3 Returned product found deficient by Stanley LaBounty will be replaced or repaired without charge F...

Страница 45: ......

Страница 46: ...T039705 2012 The STANLEY and LABOUNTY names and logos are registered trademarks of Stanley Solutions...

Отзывы: