
Constructional requirements for the wall mount
1. The 6137100 wall mount must only be installed as recommended in this manual.
2. The construction specialist responsible must con
fi
rm in writing that the applicable regional and
local codes
&
regulations have been complyed and the points listed below are taken care. The
customer must keep this con
fi
rmation with his records on the wall mount. A copy of this docu-
ment must b
e provided to labomed representative dealer
.
3. The wall Post on which the Prima wall mount is to be mounted must have the following load
Capacity:
Perpendicular force: minimum 2500 N
Tor
que
:
Perpendicular to the wall 2500 Nm minimum Parallel to the wall 2000 Nm minimum
Also take into account any additional loads acting on the wall and any other loads anchored in the
wall.
The wall
construction must comply the requirements.
4. The wall
fl
ange must be aligned in a vertical
and horizontal direction as explained in this manual
.
Note:
If an e
x
isting wall anchor plate is ever e
xc
hanged, never re-use the old anchors. New anchor holes
must be drilled. When calculating the e
ffe
ctive strength of the new anchors, make sure to take into
Account the weakening e
ff
ective of the holes in the wall.
5 . On the basis of the above aspects, the person responsible for the building must decide on and
take responsibility for the most suitable method of anchoring.
WALL MOUNT INSTALLATION PROCEDURE
(continued)
Prima
6137000-795
Prima
Issue 1.9
Printed on Sept,2021
33