LEVELING THE WALL MOUNT ON MASONRY WALL
1. Slightly tighten the bolts on the top side- leaving the bottom bolts slightly loosened.
2. Place a level across the top of the back plate to check the horizontal leveling. See figure-13.
3. Use a 17mm Socket & Ratchet arrangement to slightly loosen the Six (6) toggle bolts in the
corners of the back plate.
4. Adjust the wall mount until it is level and tighten the three RAWL bolts on the bottom leaving
the top toggle bolts loosened slightly.
5. Place a level vertically along the face of the back plate,on both sides, to ensure it is perpendicu-
lar to the floor. See figure-13
6. If the back plate is not perpendicular, insert shim material between the back plate and the wall
next to the RAWL bolts. Check with the level and tighten the toggle bolts once the mount is level.
7. Check the other side and insert shims as needed and then tighten the toggle bolts. See
figure-13.
8. When the back plate is level, both horizontally and vertically, securely tighten all Six toggle
bolts.
INSTALLING THE HORIZONTAL ARM ASSEMBLY
1. Open the microscope arm box and take out the arm.
2. Unscrew the threaded plug from wall mount shaft as shown in fig-13.
3. Assemble the Arm on wall mount shaft referring fig.3 and Reinstall the threaded plug into
place.
4. Complete the rest of Installation as per fig.1,2,3 or 4 as ordered.
WALL MOUNT INSTALLATION PROCEDURE
(continued)
Prima
6137000-795
Prima
Issue 1.9
Printed on Sept,2021
32