manualshive.com logo in svg
background image

 

 

 

 

BA_032_en_2021-11_10.01  Pressure transmitter with bourdon tube 

Page 3/5 

 

3.1  Mechanical Installation 

Before starting operation, check the process connection carefully for leaks under pressure. 

  

Use  gaskets, if  required,  that are suitable for the process connection and resistant to the 
media. 

  

3.2  Electrical Connection 

Complete the mechanical installation before you connect the device electrically. 

Set up all electrical connections while the voltage supply is switched off. 

  

Terminal box

 

2-wire 

3-wire 

 

 

Table 1: Versions of the electrical connection 

  

Operation 

During operation, take care that the device remains within its intended pressure and tem-
perature ranges. No other monitoring is necessary. 

  

Permissible media temperature:  

-

40…100 °C 

  

Permissible ambient temperature:  

-

40…70 °C 

  

4.1  Zero-point setting 

Set the zero-point of the measuring device and the angle-of-rotation sensor separately. 

  

4.1.1 

Zero-point correction 

Zero point deviations can occur due to the 
mounting, the installation position or due to 
the type and duration of use. Measuring de-
vices  with  micro  control  position  pointers 
can  be  corrected  in  a  depressurised  state 
by  means  of  the  adjusting  screw  on  the 
pointer hub (see figure 1).  

You can find further information about zero-
adjustment  of  pressure  gauge  with  micro 
adjustment pointer in the document TA_029 
on www.labom.com.  

 

Figure 1: Zero-point correction 

  

OUT

Отзывы: