background image

Chapter 7: Modifying Your Protector XStream 

 

Product Service 1-800-522-7658 

36 

Original instructions 

 
 

 

 

Figure 7-2 

 
 

Installing Rear Panels Behind the Fume 
Hood 

Your Protector XStream Fume Hood can be modified to add a rear panel behind 
the fume hood when the fume hood is placed on an island.  Contact Labconco 
Customer Service for ordering information. 
 

 

 

 

 

Side Panel 

(Ceiling Enclosure) 

Rear Stiffener 

Side Panel 

(Ceiling Enclosure) 

Hood Side Panel 

Hood Front Panel 

Front Panel 

(Ceiling Enclosure) 

Содержание Protector XStream 11041 Series

Страница 1: ...Original instructions Protector XStream Laboratory Fume Hoods Models 11041 Series 11051 Series 11061 Series 11081 Series...

Страница 2: ...ours of 7 30 a m and 5 30 p m Central Standard Time Part 9410600 Rev I ECO L864 Warranty Labconco Corporation provides a warranty to the original buyer for the repair or replacement of parts and reaso...

Страница 3: ...11 Installing the Hood on a Supporting Structure Work Surface 11 Connecting to the Hood Exhaust System 13 Connecting the Electrical Supply Source to the Protector Fume Hood 14 Connecting the Service L...

Страница 4: ...Additional Service Fixtures 37 Installing Guardian Airflow Monitors 37 Distillation Grids Field Installation 37 Installing an Electrical Duplex Outlet 38 Installation d une sortie Duplex lectrique CHA...

Страница 5: ...Fume Hood has been engineered to provide maximum containment in a laboratory and effectively contain toxic noxious or other harmful materials when properly installed The Protector XStream offers many...

Страница 6: ...ld take when using the fume hood Chapter 5 Using Your Protector XStream discusses the basic operation of your fume hood Information on how to prepare use and shut down your Protector XStream Hood are...

Страница 7: ...al information is presented in boldface type in paragraphs that are preceded by the wrench icon These operations should only be performed by a trained certifier or contractor Failure to comply with th...

Страница 8: ...nsure your installation site meets all of the requirements Then go to Chapter 3 Getting Started for instructions on how to install your laboratory fume hood and make all of the necessary connections I...

Страница 9: ...lectrical power must be located near the installation site Carefully read this chapter to learn the requirements for your installation site The location requirements The support requirements The exhau...

Страница 10: ...et and chemically resistant work surface NE PAS installer la hotte aspirante sur un chariot ou un banc mobile TOUTES les installations de la Hotte Protecteur doivent tre permanentes et fixes La struct...

Страница 11: ...u Chapitre 3 Mise en route et l Annexe C Sp cifications Premier Protector pour le sch ma de c blage pour l installation lectrique correcte Projected Airflows and Static Pressure Eco Energy Saving Air...

Страница 12: ...gas and equipped with an easily accessible shut off valve should disconnection be required Recommended operating pressure is 40 PSI with a maximum allowable pressure of 200 PSI Consider a pressure re...

Страница 13: ...r set a flat blade screwdriver a Phillips screwdriver and a carpenter level to complete the instructions in the chapter The Protector XStream Hood models weigh between 400 to 800 lbs 182 363 kg The sh...

Страница 14: ...rd The lower baffle is 12 9 tall and the middle baffle is 27 4 tall See Figure 1 1 Figure 3 1 and Figure B 1 that shows proper XStream baffle installation Do not remove the fume hood from its shipping...

Страница 15: ...est lourd Prudence en soulevant ou en d pla ant l objet When installing the Protector XStream Fume Hood onto a chemically resistant work surface or benchtop ensure that the structure can safely suppor...

Страница 16: ...ume hood as shown in Figure 3 1 2 Scribe a line on the wall or back of the base cabinet to locate the support under the work surface 3 Mount the support by attaching it to the wall or base cabinet 4 P...

Страница 17: ...ood Should higher transport velocities be required simply install a reducer after the hood exhaust outlet Consult Labconco Customer Service should you require help sizing your blower for the exhaust v...

Страница 18: ...or 230Volt 50 60 Hz 10 Amp electrical service Check the I D plate behind the front panel for voltage verification The number of circuits varies depending on the model All of the electrical connection...

Страница 19: ...ection shall not be made to the terminal box cover Tout le c blage lectrique pour la hotte aspirante devrait tre ex cut par un lectricien agr e et tre conforme tous les r gles en vigueur Dans la plupa...

Страница 20: ...Resserrer les installations l g rement si n cessaires CAUTION Do not use oxygen with any standard service fixture Contact Labconco Customer Service for oxygen fixture information PRUDENCE Ne pas util...

Страница 21: ...he flexibility to change the airflow at the sash opening of your hood To determine the actual face velocity at the sash opening airflow velocity readings will need to be taken This should be done acro...

Страница 22: ...Original instructions NOTE Face velocity profiles and smoke testing should be done periodically to ensure safe performance NOTE Les profils de flux frontal et les tests de fum e devraient tre r guli...

Страница 23: ...air supply and rear downflow baffle all work in concert to produce horizontal airflow patterns that significantly reduce chemical concentrations through the work area Depending on sash position air t...

Страница 24: ...long lasting 50 000 hour direct wired LED T8 bulbs are more energy efficient utilizing approximately the power of fluorescent bulbs See Appendix A for wattage 8 Low mounted factory wired light and blo...

Страница 25: ...is durable and corrosion resistant 18 Exhaust Connection The hood features 12 12 75 OD pipe exhaust connections sized to allow for a minimum static pressure loss through the hood structure while prov...

Страница 26: ...Chapter 4 Performance Features Safety Precautions Product Service 1 800 522 7658 22 Original instructions 23 15 18 7 4 19 10 8 9 2 12 11 5 21 1 6 17 16 22 24 22 Figure 4 1...

Страница 27: ...que la hotte de laboratoire ait t r gl e pour maintenir la s curit optimale de l op rateur la prudence devrait toujours tre utilis e en travaillant sous la hotte Avant utiliser la hotte le contr le po...

Страница 28: ...as possible It is best to keep all chemicals and apparatus 6 inside the front of the hood Toujours travailler aussi loin que possible de la hotte Il est recommand de garder tous les produits chimique...

Страница 29: ...Laboratoire Protecteur devrait tre certifi par un technicien de certification qualifi avant qu elle soit utilis e au d but La hotte devrait tre re certifi e quand elle est r install e entretenue ou d...

Страница 30: ...surfaces of the motor can become hot and could cause burns Ne pas toucher le moteur de soufflerie Les surfaces du moteur peuvent devenir chaudes et pourrait causer des br lures Do not position the fu...

Страница 31: ...eturn to 18 or electric Intelli Sash are available Operating the A Style Combination Sash Some other hood models have sashes called A Style Combination Sashes in place of vertical rising sashes These...

Страница 32: ...ar Wear a protective mask if appropriate Loading Materials and Equipment Only load the materials required for the procedure Do not overload the hood Do not obstruct the front air foil or rear baffle s...

Страница 33: ...ons Unloading Materials and Equipment Objects in contact with contaminated material should be surface decontaminated before removal from the hood All open trays or containers should be covered before...

Страница 34: ...r for proper personal protective equipment and procedure Since some service operations require a step ladder always use proper safety and consult your safety officer If performing maintenance on any s...

Страница 35: ...ous n tes pas convenablement entra n L ic ne de cl plate pr c de les op rations d entretien qui exigent des techniciens qualifi s Routine Maintenance Schedule Weekly Using ordinary dish soap to clean...

Страница 36: ...pirante par un technicien agr en certification Voir au Chapitre 3 Certifier la Hotte Aspirante Protecteur All monthly activities Toutes les activit s mensuelles Biannually The sash assembly should be...

Страница 37: ...tures air monitor distillation grids electrical duplex outlets ceiling enclosures and rear panels Installing Work Surfaces Your Protector XStream Fume Hood with Eco Foil requires a large 1 0 leading e...

Страница 38: ...djustable Fixed Height Ceiling Enclosure Kit Catalog Number Use this key to configure the seven digit catalog number to order your 3 Sided Fixed Height Ceiling Enclosure Kit For example 9550511 is a 3...

Страница 39: ...enchtop only 4 4 5 5 6 6 7 7 XL Benchtop only 8 8 STEP 2 Select the depth based on the model chosen Choose 0 for Premier and 1 for XStream Choose 1 for PVC Choose 0 1 or 2 for the correct depth of the...

Страница 40: ...the Fume Hood Your Protector XStream Fume Hood can be modified to add a rear panel behind the fume hood when the fume hood is placed on an island Contact Labconco Customer Service for ordering informa...

Страница 41: ...tal Airflow Monitor or Guardian Airflow Monitor The Guardian Airflow Monitors continuously monitor face velocity through the fume hood opening The fume hood right corner post is factory prepared to mo...

Страница 42: ...ave one installed in the field by a qualified electrician Contact Labconco Customer Service for ordering information Not acceptable on explosion proof hoods Votre Prot ge capot de fum es peut tre comm...

Страница 43: ...oxes or switches Check connection of switches Check connection to control box on top of unit Circuit breakers tripped in building electrical supply Reset circuit breakers Remote blower won t operate b...

Страница 44: ...ation See Location Requirements Chapter 2 Certifying the Hood Chapter 3 and Safety Precautions Chapter 4 sections of this manual Ref Appendix E XStream Fume hood has improper face velocity Have fume h...

Страница 45: ...tely if damaged Electrical duplex outlets no longer have power Wires not connected or faulty duplex Check wire connection or replace duplex Circuit breakers tripped in building electrical supply Reset...

Страница 46: ...GAS BLU 2E 1 9826805 WaterSaver Valve Connector HOT WATER RED 2F 1 9826806 WaterSaver Valve Connector CW GRN 2G 1 9826807 WaterSaver Valve Connector STEAM BLK 2H 1 9826808 WaterSaver Valve Connector N...

Страница 47: ...1327500 Switch Plug Fills cutout when switch is not used 11A 1 9818400 Access Cover 12A 1 9409801 Side Panel 30 internal deep hoods NOT SHOWN 12B 4 1885308 Screw Machine 10 24 x 50 Phillips 13A 1 9436...

Страница 48: ...Appendix A Protector XStream Components Product Service 1 800 522 7658 44 Original instructions 20 14 15 21 11 3 1 5 6 7 13 2 10 19 12 8 9 4 16...

Страница 49: ...oduct Service 1 800 522 7658 45 Original instructions APPENDIX B PROTECTOR XSTREAM DIMENSIONS Figure B 1 HOOD SIZE HOOD WIDTH INTERNAL HOOD WIDTH 4 48 00 38 25 5 60 00 50 25 6 72 00 62 25 8 96 00 86 2...

Страница 50: ...ge Transient over voltages according to Installation Categories II Over voltage Categories per IEC 1010 Temporary voltage spikes on the AC input line that may be as high as 1500V for 115V models and 2...

Страница 51: ...Appendix C Protector XStream Specifications Product Service 1 800 522 7658 47 Original instructions...

Страница 52: ...Appendix C Protector XStream Specifications Product Service 1 800 522 7658 48 Original instructions...

Страница 53: ...ated Protector I S Hoods with limit switches are only available from the factory due to the wiring complexity The integrated Protector I S Hood models with limit switches automatically regulate the In...

Страница 54: ...change automatically with sash position and room controls work independently Room controls are sold separate and not sold by Labconco INTELLIGENT The Integrated Intelli Sense Hood becomes a Smart Hood...

Страница 55: ...and set to activate with sash raised 20 above work surface The upper limit switch can be lowered in 1 increments between 15 and 20 Red wire to common White wire to normally open Intelli Sense Control...

Страница 56: ...Appendix D Protector I S Hood Product Service 1 800 522 7658 52 Original instructions Red wire to common Left side lower limit switch wired for low speed Black wire to normally open...

Страница 57: ...ons Airflow monitor in line sensor air pathway and wiring to monitor Night setback lower switch shown on right Switch is wired to normally open and common terminals and wired to air monitor input I P1...

Страница 58: ...Appendix D Protector I S Hood Product Service 1 800 522 7658 54 Original instructions Front of airflow monitor showing SETBACK when sash is closed...

Страница 59: ...x D Protector I S Hood Product Service 1 800 522 7658 55 Original instructions Back of airflow monitor night setback switch wiring to I P1 for Input 1 Sensor wiring in to air monitor Power in to air m...

Страница 60: ...Appendix D Protector I S Hood Product Service 1 800 522 7658 56 Original instructions 115V Wiring Diagram Automatic Operation 230V Wiring Diagram Automatic Operation...

Страница 61: ...exes on hood noted amperage applies B This fume hood includes one additional electrical receptacle individually wired to the field wired box and individually rated as 115V single phase 60Hz 20 Amps Ea...

Страница 62: ...xes may be ganged together on the same circuit with the total load of the ganged duplexes not exceeding the 10A electrical service they are wired to H This fume hood includes three additional electric...

Страница 63: ...xes may be ganged together on the same circuit with the total load of the ganged duplexes not exceeding the 10A electrical service they are wired to N This fume hood includes four additional electrica...

Страница 64: ...tiers c bl es individuellement et class comme 115V monophas 60 Hz 20 amp res Chaque duplex peut tre branch sur un circuit d di valu 20A ou les duplex peuvent tre group s ensemble sur le m me circuit q...

Страница 65: ...ent et class comme 230V monophas 60 Hz 10 amp res Chaque duplex peut tre branch sur un circuit d di class au 10A ou les duplex peuvent tre group s ensemble sur le m me circuit que la charge totale des...

Страница 66: ...ge totale des duplex coupl es ne d passant pas le service lectrique 10A ils sont c bl s N Cette hotte comprend quatre autres prises lectriques individuellement c bl s la bo te c bl es individuellement...

Страница 67: ...od face velocities between 60 100 lfpm Maximum of 125 lfpm for radioisotope hoods Duct velocities of 1000 2000 fpm for vapors gasses and smoke Stack discharge height 1 3 2 0 x building height Well des...

Страница 68: ...ng Chemicals Laboratory hoods should not be relied on for explosion protection Exhaust air from fume hoods should not be recirculated Services should be external to the hood Canopy hoods only for non...

Страница 69: ...worth Publishers 1985 Miller Brinton M et al Laboratory Safety Principles and Practices American Society for Microbiology Washington D C 1986 NIH Guidelines for the Laboratory Use of Chemical Carcinog...

Отзывы: