background image

SUMMIT

Page 5

SECTION 1.
Caring For Your Summit

Your Summit will require very little

maintenance. However, as with any fine appliance,

there are certain steps you should take to insure

continuing optimum performance.

1A. General Care

Keep your Summit area clean and free from

combustible materials, gasoline and other flammable

vapors and liquids.

If you desire, clean the jacket surfaces with a

damp cloth and mild soap. Do not use flammable

cleaning materials.

Keep vent terminal free of obstructions — do

not pile snow against vent terminal.

1B. Annual Inspection of Flue and Vents

You should visually inspect the vent pipe once a

year. Should any deterioration exist, have the affected

parts replaced.

1C. Shutting Down the Summit Boiler

If the need arises to shut down your boiler, the

following steps are required.
1.

Switch off main disconnect switch (located on

left side of unit).

2.

Close manual gas shutoff valve above

combination gas control valve (inside unit).

3.

Close main manual gas valve.

4.

If freezing is anticipated, drain Summit and be

sure to also protect building piping from

freezing.

The above steps may require qualified service

personnel.

1D. To Restart Your Summit

Should the need arise, you may have to restart

your Summit. Follow these steps:
1.

Momentarily depress reset button on top of

control panel

2.

Turn up the thermostat to call for heat.

3.

In approximately 2 seconds, the blower will

operate and ignition will occur after 35-40

seconds. It may take as long as 2½ minutes.

4.

If it does not occur, wait 5 minutes and then

repeat steps 1 through 3.

5.

If, after three attempts, you still do not get

ignition, shut down your Summit and call your

service man.

If drained, follow these steps:
1.

Follow “Installation Manual” for proper filling

and purging.

2.

Turn on main manual gas valve.

3.

Remove front cover and turn on manual gas

shutoff valve, above combination gas control

valve.

4.

Switch on main disconnect switch, depress on/

off button on front of control panel, and depress

black reset button on top of control panel (pump

and blower will start and igniter will be

energized, after 35 seconds the gas valve will be

energized, and ignition will occur). If ignition

does not occur within 2½ minutes switch “off”

main disconnect switch, wait 5 minutes and

switch “on” again. If after three attempts ignition

does not occur, initiate shutdown procedure and

call for service.

Figure 1. Cutaway View of Appliance.

Содержание SUMMIT SMB-200

Страница 1: ...water boiler installation and maintenance Improper installation and or operation could create carbon monoxide gas in flue gases which could cause serious injury property damage or death Improper insta...

Страница 2: ...al Care 5 1B Annual Inspection of Flues and Vents 5 1C Shutting Down the Summit 5 1D To Restart Summit 5 1E Annual Inspection of Condensate Drain System 6 1F In the Event of Power Failure 6 1G Full Se...

Страница 3: ...the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not to...

Страница 4: ...r le plancher QUE FAIRE EN CAS D ODEUR DE GAZ N essayez pas d allumer n importe quelque appareil que ce soit Ne touchez pas un commutateur lectrique N utilisez pas le t l phone de votre r sidence Appe...

Страница 5: ...steps may require qualified service personnel 1D To Restart Your Summit Should the need arise you may have to restart your Summit Follow these steps 1 Momentarily depress reset button on top of contr...

Страница 6: ...conduct a detailed inspection of all flue product carrying areas of the boiler and vent system This should be done in accordance with the service instruction in the Installation and Operating Instruct...

Страница 7: ...eturn temperature below 39 F 4 C Figure 3 Typical Display Identification Codes Message 1H Trouble Shooting Fault Codes The Summit boiler is controlled by a Pactrol integrated boiler control PCB which...

Страница 8: ...rvice Advisors 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 Applications Engineering 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130 www Laars c...

Отзывы: