background image

LAARS HEATING SYSTEMS

Page 2

Table of Contents

SECTION 1.
Caring For Your Summit

1A.

General Care ................................................ 5

1B.

Annual Inspection of Flues and Vents ........... 5

1C.

Shutting Down the Summit ........................... 5

1D.

To Restart Summit........................................ 5

1E.

Annual Inspection of Condensate
Drain System ................................................ 6

1F.

In the Event of Power Failure ........................ 6

1G.

Full Service Every 3 Years ............................ 6

1H.

Trouble Shooting - Fault Codes .................... 7

1H-1.

Fault Code Identification ............................... 7

Содержание SUMMIT SMB-200

Страница 1: ...water boiler installation and maintenance Improper installation and or operation could create carbon monoxide gas in flue gases which could cause serious injury property damage or death Improper insta...

Страница 2: ...al Care 5 1B Annual Inspection of Flues and Vents 5 1C Shutting Down the Summit 5 1D To Restart Summit 5 1E Annual Inspection of Condensate Drain System 6 1F In the Event of Power Failure 6 1G Full Se...

Страница 3: ...the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not to...

Страница 4: ...r le plancher QUE FAIRE EN CAS D ODEUR DE GAZ N essayez pas d allumer n importe quelque appareil que ce soit Ne touchez pas un commutateur lectrique N utilisez pas le t l phone de votre r sidence Appe...

Страница 5: ...steps may require qualified service personnel 1D To Restart Your Summit Should the need arise you may have to restart your Summit Follow these steps 1 Momentarily depress reset button on top of contr...

Страница 6: ...conduct a detailed inspection of all flue product carrying areas of the boiler and vent system This should be done in accordance with the service instruction in the Installation and Operating Instruct...

Страница 7: ...eturn temperature below 39 F 4 C Figure 3 Typical Display Identification Codes Message 1H Trouble Shooting Fault Codes The Summit boiler is controlled by a Pactrol integrated boiler control PCB which...

Страница 8: ...rvice Advisors 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 Applications Engineering 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130 www Laars c...

Отзывы: