Page 12 of 12
12. Once the CO2 has stabilized and is within specification, set DIP Switches 6
and 7 to the “OFF” position (Normal Operation).
13. Remove all test equipment, re-install the combustion port test plug.
14. Fasten the boiler cover back onto the boiler.
Page 13
Customer Service and Product Support:
800.900.9276 • Fax 800.559.1583
20
Industrial Way, Rochester, NH, USA 03867
FT WALL MOUNTED AND FLOORSTANDING COMBI MODELS