Transceiver and Processing Unit
D-37
To power up the TPU and verify proper operation of the TPU and LAN:
1.
With the towfish and LAN cables removed from the TPU, turn the power on. This
will test the basic TPU.
On the DSP board,
• Light A will light, then go off.
• Light B will light, then go off.
• Light C will light, and lights A and B will flicker.
• VME light stays off.
On the Demultiplexer board,
• LOCK LOSS light will be off.
• ERROR light will light and stay on.
On the CPU board,
• CPU, BFL, SCSI BUSY, PIB BUSY will all light.
• SCSI BUSY, PIB BUSY will go out.
• CPU light will blink off and then come back on.
• CPU, BFL will both go off, and then the CPU light will come back on and
stay on.
2.
Turn the TPU off.
Содержание SERIES 5000
Страница 27: ......
Страница 59: ......
Страница 162: ...Splashproof TPU Drawings 6 13 ...
Страница 163: ...6 14 CHAPTER 6 Splashproof TPU Series 5000 Sonar System Operations and Maintenance Manual P N 11210060 Rev 13 0 ...
Страница 164: ...Splashproof TPU Drawings 6 15 ...
Страница 165: ...6 16 CHAPTER 6 Splashproof TPU Series 5000 Sonar System Operations and Maintenance Manual P N 11210060 Rev 13 0 ...
Страница 166: ...Splashproof TPU Drawings 6 17 ...
Страница 167: ......
Страница 170: ...A 3 Figure A 1 Cable Length vs Towfish Depth Graph 1 ...
Страница 172: ...A 5 Figure A 3 Cable Length vs Towfish Depth Graph 3 ...
Страница 174: ...A 7 Figure A 5 Cable Length vs Towfish Depth Graph 5 ...
Страница 175: ......
Страница 179: ......
Страница 203: ......
Страница 262: ...NMEA 0183 Formats and Information D 59 D 13 NMEA 0183 Formats and Information ...
Страница 264: ...NMEA 0183 Formats and Information D 61 ...
Страница 265: ......
Страница 268: ...E 3 ...
Страница 270: ...E 5 ...
Страница 272: ...E 7 ...
Страница 274: ...E 9 ...
Страница 276: ...E 11 ...
Страница 278: ...E 13 ...
Страница 280: ...E 15 ...
Страница 282: ...E 17 ...
Страница 283: ......