L-K Industries Benchmark C Скачать руководство пользователя страница 5

www.lk-ind.com & 713-926-2623

Page. 5

Getting Started

Introduction and Safety Precautions

The Benchmark C Heated Laboratory Centrifuge is intended for use in Class I, Division 2 testing 

laboratories and refineries. It operates on 120/240VAC and comes completely assembled and ready 
for installation. Also included are a set of tubes, cushions, shields and collars (four each). Unpacking 
and lifting the centrifuge should always be done by at least two people. Retain the custom packaging 
materials for future shipping or storage. 

The unit is equipped with a programmable digital temperature controller with an LCD display. The 
RTD meter, or temperature controller, is preset at 140°F (60°C). There is an encoder driven 
tachometer with an LCD display of the actual motor speed. Variable speed motor control is included 
with a preprogrammed acceleration/deceleration ramp to ensure smooth operation. 

The programmable countdown timer is integrated with the motor controller – the countdown begins 
only upon reaching the designated speed for the test. Both the timer and the temperature controller 

settings are adjustable.

This centrifuge is designed to optimize operator safety and includes an automatic-locking door. 
Carefully following safety guidelines (i.e. OSHA) and knowing the limits of this unit will help prevent 

accidents.

REMOVE

 all foreign objects from the centrifuge bowl.

 Keep the sliding door 

CLOSED

, especially while samples are spinning.

NEVER 

try to slow the trunnion arm down manually. Allow the trunnion arm to come to a 

complete stop before removing samples.

Turn all switches 

OFF 

when not in use.

NEVER 

leave the centrifuge unattended while it is turned on or operating.

DISCONNECT 

the power supply before removing or replacing electrical or mechanical parts.

DO NOT

 leave oily or solvent saturated rags in or around the unit.

DO NOT

 allow unauthorized persons to operate the centrifuge.

BE AWARE

 of surroundings. 

DO NOT

 operate the unit when fatigued or under the influence of 

medication, alcohol or illegal substances.

If a tube has broken inside of a shield, the cushion 

MUST 

be replaced.

Use 

CAUTION 

during heated operation, as the top of the unit is hot to the touch.

The following guidelines can help prevent user error/injury and improve operation:

Содержание Benchmark C

Страница 1: ...MANUFACTURING QUALITY and customer service in the PETROLEUM TESTING industry BENCHMARK C MANUAL Heated Laboratory Centrifuge Demand a higher standard L K INDUSTRIES Petroleum Testing Equipment Supplie...

Страница 2: ...Our original Melton centrifuge set the standard in 1957 and continues to inspire our product development today We look forward to continuing the rich traditions that have made us successful and to ma...

Страница 3: ...stribution Partner the warranty lasts one year from the in service date During the one year warranty period L K Industries shall repair or replace defective equipment free of charge L K Industries sha...

Страница 4: ...s Installation Electrical Connection 9 9 10 10 11 11 Loading and Powering On Heated Operation Timer Operation Motor Operation MAINTENANCE 12 12 12 Replacement Parts Repair Services Housekeeping Replac...

Страница 5: ...r the test Both the timer and the temperature controller settings are adjustable This centrifuge is designed to optimize operator safety and includes an automatic locking door Carefully following safe...

Страница 6: ...nt in Lubricating Oils ASTM D2709 Standard Test Method for Water and Sediment in Middle Distillate Fuels by Centrifuge ASTM D893 Standard Test Method for Insolubles in Used Lubricating Oils Applicable...

Страница 7: ...h unbalanced tubes and shields Ensure that all collars cushions and shields are installed properly and in the correct orientation as shown in gure 2 Figure 2 A B C D Cushion Orientation CUSHION NOT US...

Страница 8: ...lectric code and in conformance with the standards for Class I Division 2 hazardous locations Refer to the wiring detail below Figure 3 120VAC 240VAC Model Wiring Diagrams In geographical regions wher...

Страница 9: ...l for foreign objects and close the door The green STO ACTIVE indicator light turns on when the door is properly closed Safe Torque O STO is a safety function that cuts o the supply voltage when the d...

Страница 10: ...n at 85 C 185 F Once the switch opens power to the dual bowl heaters is shut o To reset the switch turn o the MAIN DISCONNECT switch Use a athead screwdriver to remove the silver cap Manually press th...

Страница 11: ...hanism will remain engaged until the motion of the rotor has stopped To stop the motor during normal operation press the PUSH TO STOP button When the RPM INDICATOR reads 0 wait for the locking mechani...

Страница 12: ...ions inside the trunnion shields for excess wear Before each test examine moving parts electrical and mechanical for wear and stress Replace parts as necessary If a tube has broken inside a shield the...

Страница 13: ...the OFF position When the motor controller is functioning properly the green indicator light will be lit If the green light does not turn on when the MOTOR POWER ON button is pressed there are several...

Страница 14: ...p Diameter RPM 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 20 38 RCF 12 18 26 36 46 59 73 88 104 123 142 163 186 210 235 262 290 320 351 384...

Страница 15: ...mming diagrams may be found at www lk ind com downloads Temperature Controller Quick Programming RPM Quick Programming Timer Quick Programming MODEL LB14 C120C LB14 D120C Tip to tip Diameter RPM 1400...

Страница 16: ...DC Scienti c Grainger Parkes Scienti c www amazon com www coleparmer com www dcscienti c com www grainger com www parkesscienti c com Catalog 2017 L K Industries All Rights Reserved L K INDUSTRIES is...

Отзывы: